From the paper's conclusion- The framework is demonstrated on the IEEE 33-bus benchmark using the observed Lithuanian 2025 hourly load shape and the 2026 Energy Distribution Operator (DSO) flexibility product as well as the Lithuanian National Energy Regulatory Council (VERT) context; it is not an actual Lithuanian feeder model.
Abstract
Distribution flexibility can be overvalued when priced before network-side alternatives and resource deliverability are screened. This study develops a three-gate appraisal framework for local flexibility as a non-wires alternative (NWA): network incrementality, resource deliverability, and conditional economic value. The framework is demonstrated on the IEEE 33-bus benchmark using the observed Lithuanian 2025 hourly load shape and the 2026 Energy Distribution Operator (DSO) flexibility product as well as the Lithuanian National Energy Regulatory Council (VERT) context; it is not an actual Lithuanian feeder model. At the year-3 stress point, the normal topology violates the 0.95 p.u. analytical threshold, but the screened connected-radial topology space contains a compliant configuration, so paid flexibility has no incremental value in that benchmark state if an equivalent configuration is operationally permissible. In contrast, the Zone-C L22 contingency remains non-compliant after topology-only screening and leaves a 222.1 kW local residual requirement at buses 23–24. With a 20% controllable-demand bound, 106.1 kW of firm injection remains necessary, showing that an electrical support requirement may map to demand response, firm injection, or a hybrid portfolio. Economic eligibility then depends on the genuinely deferrable share of reinforcement. The contribution is the ordered stopping logic that separates electrical need, physical deliverability, and attributable economic value.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Dynamic Decision-Based Network Reconfiguration for Active Distribution Systems Considering Time-Varying Distributed Energy Resource CommitmentsEnergies · 2026
- Explicit Convex Inner Approximation of TSO-DSO Flexibility Regions via Exact Second-order Cone Relaxation in Radial NetworksarXiv · 2026
- Dynamic operating envelopes in distribution grids: Current advances, challenges, and future opportunitiesApplied Energy · 2026
- A Cost-Aware Framework for Prosumer Flexibility CoordinationEnergies · 2026
- Controller- and Communication-Aware Flexibility Margins for Electric Distribution NetworksarXiv · 2026
- Evaluating Congestion Zoning in DSO Flexibility Markets Using Sensitivity FactorsInternational Transactions on Electrical Energy Systems · 2026