Asynchronous Cross-Modal Dynamic Graph Learning for Intelligent Sensing of AI Computing Infrastructure Expansion.
Zhe Xiang, Shangshan Chen, Xinrui Hu, Xu Xu, Yang Yang, Jingyi Yang, Yan Zhan
Peking University, Beijing 100871, China. · China Agricultural University, Beijing 100083, China.
Key points
From the paper's conclusion- To address these challenges, a multimodal industrial sensing dataset for artificial intelligence computing infrastructure was constructed, and an artificial intelligence-driven asynchronous cross-modal dynamic graph prediction framework was developed.
Abstract
The rapid expansion of artificial intelligence computing infrastructure and the semiconductor industry has made the dynamic sensing of policy planning, technological innovation, capital investment, and physical construction essential for industrial monitoring and resource allocation. However, policy documents, remote-sensing imagery, patent relations, and economic indicators exhibit substantial heterogeneity, temporal misalignment, and variations in data quality, making it difficult for conventional unimodal or synchronously fused methods to accurately characterize the continuous evolution of construction activities. To address these challenges, a multimodal industrial sensing dataset for artificial intelligence computing infrastructure was constructed, and an artificial intelligence-driven asynchronous cross-modal dynamic graph prediction framework was developed. Differential temporal lags among policy announcements, capital investment, patent growth, and physical construction are learned through an asynchronous cross-modal alignment module. Interference caused by cloud contamination, missing text, patent disclosure delays, and incomplete economic observations is dynamically suppressed through a reliability-aware fusion mechanism. Time-varying propagation relationships among countries, enterprises, patents, and industrial parks are further modeled using an economically modulated dynamic heterogeneous graph. Experimental results demonstrate that, in next-window construction event prediction, the proposed model achieved an Accuracy of 91.72%, a Precision of 91.08%, a Recall of 90.64%, an F1-score of 90.86%, and a ROC-AUC of 95.67%, significantly outperforming baseline methods including XLM-R, Swin Transformer, TimesNet, HGT, and TGN. In construction intensity forecasting, the model achieved an MAE of 0.104, an RMSE of 0.153, a MAPE of 10.91%, an R2 of 0.854, and a Pearson correlation coefficient of 0.928. Ablation experiments further confirmed the effectiveness of asynchronous alignment, reliability calibration, missing-modality compensation, economic modulation, and long-term graph memory. The proposed approach provides a temporally interpretable intelligent sensing method for monitoring computing center construction, evaluating industrial park expansion, allocating energy and communication infrastructure, and planning equipment supply.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Dynamic graph neural networks meet causal inference: estimating AI’s heterogeneous effects on supply chain resilienceFuture Technology · 2026
- Adaptive dynamic graph learning for forecasting urban multimodal flowInternational Journal of Geographical Information Systems · 2025
- Cross-Modal Graph Attention for Bridge SHM Data ImputationSensors · 2026
- Trends and Hotspots in the Convergence of Artificial Intelligence and Cell and Gene Therapy: A Patent Analysis.Current gene therapy · 2026
- From Function to System: Artificial Intelligence and the Propagation of Economic ChangeAI for Society · 2026
- LLM-enhanced Graph Contrastive Learning for Technology Flow ForecastingACM Transactions on Information Systems · 2026