Inversion of Soil Parameters and Deformation Prediction for Deep Excavation Based on PSO-SVM Model
Jing Zhao, Longhui Chen, Hongyin Yang, Bin Li, Linlong Yang, Hao Peng, Hongyou Cao
China Railway Group (China) · Wuhan Institute of Technology
Key points
From the paper's conclusion- The results demonstrate that the absolute error of the peak maximum horizontal displacements of the retaining structures after inversion is maintained within 1 mm.
Abstract
During deep excavation, actual soil parameters undergo changes. To enhance the accuracy of soil parameter selection in finite element simulation and improve the precision of finite element analysis, an inversion method for soil parameters based on a PSO-SVM model is proposed. In this method, the particle swarm optimization (PSO) algorithm is utilized to optimize the penalty parameter C and kernel function parameter g of the support vector machine (SVM) model. The optimized PSO-SVM model is employed to establish a nonlinear mapping relationship between the horizontal displacements of retaining structures in deep excavations and soil parameters through orthogonal experimental design and finite element simulation analysis. Subsequently, soil parameters are inverted from monitoring data of horizontal displacements of retaining structures, and the reliability of the parameters is verified. The deformation of the retaining structures during subsequent cases is then predicted. The results demonstrate that the absolute error of the peak maximum horizontal displacements of the retaining structures after inversion is maintained within 1 mm. The maximum relative error is reduced from 18.96% before inversion to 7.63%, indicating that the inverted soil parameters for the deep excavation possess high accuracy. The precision of the finite element simulation for deep excavation is significantly improved, effectively reflecting the actual mechanical properties of the soil during the construction stage. The inverted parameters can be used for the prediction of subsequent retaining structure deformation. During subsequent construction conditions, the predicted maximum horizontal displacement (deformation) of the retaining structure at monitoring point CX1 is 15.66 mm, and that at monitoring point CX2 is predicted to be 14.22 mm. Neither value exceeds the project warning threshold of 30.00 mm.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A PSO ‐Optimized Multimodel Residual‐Correction Approach for MLR ‐Based In Situ Stress InversionEngineering Reports · 2026
- Random particle finite element method for probabilistic slope large-deformation analysis accounting for spatial variabilityJournal of Rock Mechanics and Geotechnical Engineering · 2025
- Inversion analysis of the stress field in a pumped-storage power station based on the PSO-XGBoost and the finite element model.Scientific reports · 2026
- Cross-Condition Prediction of Pointwise Surface Settlement Using Key Tunneling Parameter Selection and Transfer LearningSymmetry · 2026
- Slope Stability and Safety Assessment Based on Random Forest Enhanced under Multi-Strategy Pelican OptimizationICCK Transactions on Systems Safety and Reliability · 2026
- Parameter Identification and Uncertainty Analysis of Stone‐Column‐Reinforced Composite Foundations Constrained by Static Load TestsInternational Journal for Numerical and Analytical Methods in Geomechanics · 2026