Statistical Evidence for a DQN-Family Advantage in a Resource-Coupled Satellite-Ground Scheduling Benchmark
Bocheng Yang, Lujie Zheng, Dingyang Lyu, Jian Liu, Bo Chen
Key points
From the paper's conclusion- These findings apply only to this synthetic, soft-constraint benchmark.
Abstract
Resource-coupled satellite-ground scheduling requires decisions whose computational, energy, thermal, and communication effects persist across task arrivals. We tested whether the deep Q-network (DQN) family provides a reproducible advantage over short-horizon planning in a synthetic benchmark with clipped, soft-constrained resources. Six DQN objectives used the same state representation, network architecture, replay procedure, optimizer, interaction budget, 20 model seeds, and held-out traces. Across five fully coupled regimes, every one of the 30 objective–regime comparisons had lower mean episode cost for DQN than for four-step model-predictive control (MPC-4). Every paired 95% bootstrap interval excluded zero, and all Holm-adjusted sign tests supported this ordering. The least-favorable mean difference was −5.92, with a family-wide simultaneous 95% upper bound of −5.03. Differences among DQN objectives were smaller and scenario-dependent. Additional nominal tests assessed discount-factor, training-length, greedy-rollout, and CPU decision-time sensitivity. These findings apply only to this synthetic, soft-constraint benchmark. Hard energy and thermal limits can change the feasible action set and therefore the algorithm ordering.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Risk-Sensitive Mission Planning for Multi-Target On-Orbit Inspection via Distributional Reinforcement LearningarXiv · 2026
- MP-PPO for Opportunity-Aware Deep Space Mission SchedulingJournal of Physics: Conference Series · 2026
- A schedule-repair-enhanced two-stage method for multi-satellite earth observation task schedulingJournal of Physics: Conference Series · 2026
- From Historical Schedules to On-Sky Control: Autonomous Scheduling on the 4-m Blanco TelescopearXiv · 2026
- Risk-Aware Aircraft Fleet Maintenance Under Partial Observability and Airport Resource ConstraintsAerospace · 2026
- Deep Reinforcement Learning for HPC Job Scheduling: A Statistical EvaluationarXiv · 2026