A Review of Management Reserves in U.S. Government Construction Cost Estimation
Geoffrey Rothwell
Nuclear Energy Agency
Abstract
While there is some agreement on estimating construction cost contingency for “known unknowns,” there is little consensus on estimating management reserves for “unknown unknowns.” Definitions of risk and uncertainty also differ between the economics and finance literature and the cost engineering literature. This paper examines how cost engineering guidance on estimating management reserves is applied in government-sponsored project cost estimates. This lack of consensus is evident in a specific program: the management, treatment, and disposal of 212,000 cubic meters of mixed radioactive and hazardous chemical waste generated by plutonium production at the Hanford Nuclear Site. Over $30 billion has been invested in treatment facilities, vitrification plants, and laboratories analyzing gases, liquids, sludges, and salt cake from 177 aging storage tanks. The remaining construction and operating costs are highly uncertain, with estimates ranging from $300 billion to $640 billion. Analyses of alternatives for constructing Hanford waste treatment facilities assume 15% contingencies and 40% management reserves. A method is presented to compute the implicit moments of Extreme Value distributions of cost estimates for different options, helping determine whether one alternative’s cost estimate stochastically dominates others. Adopting industry definitions of contingency and management reserves by federal government agencies could improve construction cost estimation in government-financed programs.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Multi-Criteria Decision Analysis (MCDA) in Nuclear Facilities: A Review of Potential Benefits and RisksApplied Sciences · 2026
- Parameter-Level Attribution of Uncertainty in Electricity Carbon Footprint Factors: A Case Study of Coal-Fired and Hydropower Plants in a Chinese ProvinceEnergies · 2026
- A Preliminary Carbon-Footprint Comparison of Low-Activity Radioactive Waste Immobilization TechniquesSustainability · 2026
- HyFive : Practical Techno‐Economics and Valuation Framework for Geological Storage of HydrogenEnergy Storage · 2026
- Key uncertainties for hydrogen in Switzerland: insights from global sensitivity analysis and Plackett-Burman designInternational Journal of Hydrogen Energy · 2026
- Comparative techno-economic assessment of stationary hydrogen storage technologiesInternational Journal of Hydrogen Energy · 2025