Coupled Hydromechanical Assessment of Wellbore Trajectory Curvature and Drilling Fluid Density at Multilateral Well Junctions
Donglei Jiang, Ming Luo, Haowei Feng, Aopeng Zhang, Zilong Gong, Xuanhua Zhu, Rui Dai, Chuanliang Yan
Key points
From the paper's conclusion- At a build-up rate of 20.2° per 30 m, increasing the drilling fluid density from 1.07 to 1.19 g/cm3 reduced the width from 0.130 to 0.087 m and the longitudinal extent from 0.370 to 0.184 m, indicating a contraction of the connected plastic zone for the conditions examined.
Abstract
The junction between a main borehole and a lateral in deepwater, deep multilateral horizontal wells is characterized by abrupt geometric transitions, a thin intervening rock web, and overlapping stress disturbances. These features can induce local compressive-shear yielding and wellbore instability. This study investigates the effects of lateral trajectory curvature and drilling fluid density on the mechanical response of the rock web in a deep sandstone reservoir. A three-dimensional coupled pore-pressure–displacement finite element model of the main–lateral junction was developed using Biot poroelasticity, Darcy’s law, and the Mohr–Coulomb criterion. First, lateral build-up rates of 10.2, 15.2, and 20.2° per 30 m were compared at a fixed drilling fluid density. Next, densities from 1.07 to 1.19 g/cm3 were evaluated at a fixed build-up rate of 20.2° per 30 m. A continuous plastic zone defined by equivalent plastic strain (PEEQ) and directly connected to the borehole wall was used as a numerical indicator of potential instability; its transverse width and longitudinal extent were measured. Plastic yielding was concentrated near the main–lateral junction and the tip of the rock web. When the build-up rate increased from 10.2 to 20.2° per 30 m, the connected plastic-zone width increased from 0.053 to 0.092 m, whereas its longitudinal extent decreased from 0.340 to 0.192 m (a 43.5% reduction). This wider-but-shorter pattern may be associated with more rapid thickening of the rock web and a shorter interval of overlapping borehole-induced stress disturbances. At a build-up rate of 20.2° per 30 m, increasing the drilling fluid density from 1.07 to 1.19 g/cm3 reduced the width from 0.130 to 0.087 m and the longitudinal extent from 0.370 to 0.184 m, indicating a contraction of the connected plastic zone for the conditions examined. The study evaluates curvature and fluid-density effects through two separate one-factor hydromechanical comparisons of the PEEQ plastic zone and pore pressure (POR) field. Neither joint trajectory–density optimization nor the determination of optimal drilling parameters is attempted.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Evaluation of Moderate Collapse Characteristics and Optimization of Drilling Fluid Density for Horizontal Wells in Deepwater Gas FieldsProcesses · 2026
- Towards successful drilling operations through geomechanical modelling and wellbore stability analysis: a case study on the Ouan Kasa reservoir in the Ghadames Basin, LibyaPetroleum Geoscience · 2025
- Backstress-dominated regimes of fluid-driven fractures in poroelastic media: a simplified asymptotic frameworkJournal of Fluid Mechanics · 2026
- Mechanism of Wellbore Instability and Drilling Fluid Technology Countermeasures in Naturally Fractured Formations Under High In Situ StressProcesses · 2026
- Analysis of Drilling Fluid Loss Behavior in Deepwater Shallow Formations.ACS omega · 2026
- Instability mechanism and wellbore stability of hard brittle mudstone in the Mahu Sag: a hydration-fracture coupling perspectiveGeosystem Engineering · 2026