Processes

Enhanced Disturbance-Rejection Generalized Predictive Control for a Large-Delay Boiler Water Dosing Process

Jiadong Wang, Ming Zhang, Nan Zhao, Wei Ai, Zikang Tang

Key points

From the paper's conclusion
  • Industrial operating results, including measured phosphate-concentration trends, support the practical applicability of the proposed control framework.

Abstract

Boiler water phosphate dosing is characterized by large transport delays, model uncertainty, and external disturbances, making accurate concentration regulation challenging. This paper proposes an extended-state-observer-assisted generalized predictive control (ESO-GPC) strategy for large-delay phosphate-dosing processes. A stepwise GPC formulation is employed to simplify the control optimization, while a two-path Time-Delay Compensator (TDC) combines the nominal delay-free model response with measured plant feedback to alleviate the effects of transport delay. A fal-based nonlinear speed-planning mechanism is further introduced after ESO disturbance compensation to adjust positive control-input increments as the applied command approaches a prescribed upper reference boundary, thereby promoting smoother control actions. Comparative simulations under model mismatch, additional transport delay, and external disturbances are conducted against Smith-GPC, ADRC, and PID controllers. Simulation results show that, with an additional 50 s transport delay, ESO-GPC reduces overshoot from 35.35% to 20.99% and cumulative control-input variation by 49.59% compared with Smith-GPC. The TDC ablation study further demonstrates a 39.35% reduction in control-input variation when fal attenuation is enabled. Industrial operating results, including measured phosphate-concentration trends, support the practical applicability of the proposed control framework.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Enhanced Disturbance-Rejection Generalized Predictive Control for a Large-Delay Boiler Water Dosing Process — Science Skim