Key points
From the paper's conclusion- The results confirm that integrating geomechanical design with process engineering provides a technically robust and economically efficient basis for REE deposit development.
Abstract
The rapid advancement of high-technology industries critically depends on the supply of rare earth elements (REEs), which constitute strategic raw materials for knowledge-intensive sectors. This study proposes an integrated methodological framework for the development of the Kundybay REE deposit, combining geomechanical substantiation of open-pit slope stability with beneficiation optimization of weathering-crust ores. The novelty of the research lies in the justification of rational pit-wall parameters based on a coupled 3D geological–geotechnical model implemented in the Micromine environment. Structurally disturbed zones were identified and subjected to detailed stability analysis using numerical modeling techniques. Particular emphasis was placed on the delineation of geotechnical domains and factor-of-safety evaluation in Slide2, which enabled refinement of design solutions and optimization of slope geometry. Simultaneously, the study addresses processing challenges of refractory weathering-crust ores through the application of ultrasonic aerohydraulic desliming combined with a vibro-centrifugal separation device. Optimization of slope parameters resulted in a 30 Mt reduction in stripping volume, corresponding to a 16.7% economic gain. The proposed flowsheet achieved a concentrate grade of 948.89 g/t REEs with an overall recovery of 45.66%. The results confirm that integrating geomechanical design with process engineering provides a technically robust and economically efficient basis for REE deposit development.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Geomechanical Modeling of the Northern Katpar Deposit (Kazakhstan): Assessing the Impact of Rock Mass Disturbance on Stability Safety FactorMining · 2025
- Integrated Geotechnical Assessment of Deep Open-Pit Slope Stability Under Structural and Hydrogeological ConditionsEng · 2026
- Advances in discrete element modeling of rock fracture for next-generation comminution modelsComputational Particle Mechanics · 2025
- Three-dimensional progressive damage and geohazard assessment of an open-pit slope affected by subsurface voids and staged excavation: a case study of the Nanfen mineFrontiers in Earth Science · 2026
- Hydro-Mechanical Performance Framework for Performance-Based Quality Control of Excavated-Material FillsGeotechnics · 2026
- Multiscale track-seabed dynamic interaction during deep-sea seabed mining across operational modesInternational Journal of Mining Science and Technology · 2025