Mathematics

Distributed Observer Design for Multi-Agent Nonlinear Systems with Heterogeneous Output Delays via Petersen and Scenario Relaxations of Polytopic LMIs

Hend Aljahani, Aicha Ben Makhlouf, Omar Naifar

Computational · n=800

Key points

From the paper's conclusion
  • We reduce this cost in two ways: a Petersen-type certificate that replaces the 2K vertex constraints by one bordered semidefinite program (SDP) of size linear in K, and a scenario program that, from M random vertices, returns a probably-approximately-correct (PAC) bound on the fraction of vertices where the LMI fails.

Abstract

A single nonlinear plant is often watched by several agents, each receiving the output through its own delayed channel. Building on the dynamic-extension observer of Arezki, Zemouche and Bagnerini, hereafter AZB, we give a distributed observer for this setting and a way to make its design computationally affordable. Each agent removes its own measurement delay yi(t)=h(x(t−τi(t))) by a local dynamic extension and shares only its state estimate with its neighbours over a communication graph. Using an integral-Jacobian polytopic embedding and a per-agent Lyapunov–Krasovskii functional, we prove that a single delay-dependent linear matrix inequality (LMI) of the AZB form, solved once at the largest delay, together with a scalar small-gain bound on the consensus gain κ, drives every estimation error to zero and makes the local estimates agree. This synthesis LMI contains neither κ, nor the number of agents, nor the graph, so it is exactly the single-agent AZB condition; adding the consensus term therefore neither enlarges nor shrinks its feasible set, and asymptotic agreement already holds at κ=0. A sharper spectral certificate extends to directed and switching graphs and certifies κ=0.6 on the undirected and directed cycles and for intermittent links; on the chorded digraph, the directed tree and the switching case, a joint matrix test certifies it after re-solving the LMI. The AZB LMI, however, ranges over a number of Jacobian-polytope vertices that grows like 2K in the number K of uncertain Jacobian entries. We reduce this cost in two ways: a Petersen-type certificate that replaces the 2K vertex constraints by one bordered semidefinite program (SDP) of size linear in K, and a scenario program that, from M random vertices, returns a probably-approximately-correct (PAC) bound on the fraction of vertices where the LMI fails. All programs are solved in Python with the Cvxpy/Clarabel stack on the AZB bioreactor benchmark extended to a five-agent network. The polytopic LMI recovers the delay margin τ⋆=34.5 s; the distributed observer drives every estimation error below 10−3 within 38 s under heterogeneous delays drawn in [2.0,5.5] s; and with M=800 samples, the scenario program returns τscen⋆=6.11 s on an inflated polytope of 2·212=8192 vertices, close to the exhaustive value τexact⋆=6.12 s and, at the fixed delay τ=5.9 s with M=800 (above the PAC bound M≥677), a mean vertex-violation rate of 0.479%, well below the 5% PAC target. Directed-graph tests, comparisons with baseline observers and a study of sensor noise and packet loss complete the evaluation.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Distributed Observer Design for Multi-Agent Nonlinear Systems with Heterogeneous Output Delays via Petersen and Scenario Relaxations of Polytopic LMIs — Science Skim