Machines

Data-Driven Tooling Condition Monitoring in Smart Injection Moulding: Interpretable Production Signatures for Maintenance Decision Support

Sonia Val

Key points

From the paper's conclusion
  • The results demonstrate the potential of existing shop-floor data as a low-cost, interpretable inspection-prioritisation layer, while the limited number of independent maintenance cycles and high false-alarm burden require further prospective validation.

Abstract

Condition monitoring in injection moulding commonly relies on dedicated in-mould sensing, whereas the potential of routinely collected production data for indirect tooling-condition surveillance remains less established. This study proposes an interpretable, maintenance-event-centred framework that uses existing production records without additional mould sensors. The dataset comprised 427 production-interval records, of which 407 were retained after preprocessing. Ten maintenance dates were consolidated into five episodes, although only four cycles contained sufficient healthy and pre-maintenance observations for independent predictive validation. Features describing cycle-time behaviour, mould-related stoppages, defect rates, cumulative production, and time since maintenance were evaluated using statistical methods, Isolation Forest, Random Forest, and gradient-boosted trees under leave-one-maintenance-cycle-out validation. For the primary 7-day warning horizon, gradient-boosted trees achieved balanced accuracy of 0.700, F1-score of 0.754, AUROC of 0.659, and average precision of 0.743. All four evaluable maintenance events were detected, with a median warning lead time of 6.45 days, although the model generated 50.0 false alarms per 100 healthy production intervals. A feature-set robustness analysis showed that cumulative production and time since maintenance were dominant maintenance-proximity proxies: excluding both reduced balanced accuracy to 0.609 and average precision to 0.490, while an exposure-only model detected three of four episodes at the operational threshold. Process and quality variables therefore provided complementary operational information, but the model should be interpreted as an indirect maintenance-proximity surveillance tool rather than a direct measure of physical mould degradation. The results demonstrate the potential of existing shop-floor data as a low-cost, interpretable inspection-prioritisation layer, while the limited number of independent maintenance cycles and high false-alarm burden require further prospective validation.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Data-Driven Tooling Condition Monitoring in Smart Injection Moulding: Interpretable Production Signatures for Maintenance Decision Support — Science Skim