From the paper's conclusion- These findings clarify how bolt confinement, surrounding-rock creep, and sequential composite-lining behaviour interact.
Abstract
Time-dependent creep of the surrounding rock in deep-buried soft-rock tunnels continuously redistributes support loads, producing a distinct sequential load-sharing process between the primary support and the secondary lining. Existing analytical solutions remain limited in their ability to characterize both the local reinforcement imparted by bolts and the long-term cooperative bearing of composite linings. Here, a CVISC (Burger-creep viscoplastic) model analytical framework is formulated for composite linings in deep-buried soft-rock tunnels by explicitly incorporating bolt-induced body forces. The bolted and unbolted zones are treated as mechanically distinct domains. A prescribed body-force term represents axial-force attenuation and interfacial shear transfer generated by the initial bolt pretension. Excavation stress release, the Mohr–Coulomb yield criterion, and radial deformation compatibility between the primary support and secondary lining are then coupled to derive time-dependent solutions for surrounding-rock displacement, plastic-zone radius, and component-specific support pressure. FLAC3D (Fast Lagrangian Analysis of Continua in 3 Dimensions) simulations corroborate the theoretical predictions, including plastic-zone expansion, tunnel-wall convergence, and the rapid initial growth followed by progressive stabilization of support pressure. Parametric analyses identify in situ stress, rheological properties of the surrounding rock, excavation rate, and support installation time as first-order controls on long-term load transfer. The bolt contribution is localized near the tunnel wall and attenuates radially. The secondary lining primarily resists the additional creep load mobilized after its installation, with its load-sharing ratio rising from zero to approximately 25–45% and approaching 50% under selected conditions. These findings clarify how bolt confinement, surrounding-rock creep, and sequential composite-lining behaviour interact.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Optimization of rock bolt support parameters for TBM tunnels in high in situ stress soft rock based on deformation and stress evolution analysisFrontiers in Earth Science · 2026
- Surrounding Rock Response and Support Optimization of a TBM-Excavated Roadway in Composite Strata: A Case StudyApplied Sciences · 2026
- Bearing capacity of composite tunnel lining in soft rocks: Large-scale model testJournal of Rock Mechanics and Geotechnical Engineering · 2025
- The synergistic effect and mechanical properties of a composite support system with a steel‐strand‐reinforced composite steel mesh and a flexible shotcrete layerDeep Underground Science and Engineering · 2026
- Installation timing and deformation prediction of multi-layer supporting structures for deep-buried and soft-rock tunnels under high geo-stressTunnelling and Underground Space Technology · 2026
- Instability Characteristics and Active Control of Jointed Surrounding Rock in Super-Large-Span Shallow-Buried TunnelsEngineering Research Express · 2026