Risk-Informed Decision Support for IMO Polar Code Rule-Making: Development and Internal Evaluation of H-PORA, a Human-Element-Centric Formal Safety Assessment Framework for Ship Machinery
Woo-Kun Lee, Sang-Kyun Park, Tae-Youl Jeon, Young-Chan Lee
Key points
From the paper's conclusion- The evaluation reported here is internal throughout: no polar casualty that is both machinery-initiated and cold-driven is available in the public record for external verification, so these figures establish the internal consistency of the model rather than its predictive accuracy, and H-PORA is offered as a prototype decision-support tool rather than an instrument for regulatory compliance audit.
Abstract
The IMO Polar Code and POLARIS remain navigation- and structure-oriented, so machinery risk from cold, mechanical degradation and human error is not quantified. This paper develops and internally evaluates Human-element-centric Polar Operations Risk Assessment (H-PORA), a machinery-centred extension of Formal Safety Assessment. It takes the POLARIS Risk Index Outcome as input, propagates conditional cause–consequence dependence through a hybrid Bayesian–bow-tie model, and scales the human error probability by an explicit cold-correction factor within SPAR-H. Under the adopted assumptions, the model estimates that accident probability rises about thirteen-fold at −25 °C (90% uncertainty interval 7 to 27 for declared ±25% coefficient ranges). Machinery degradation supplies about four-fifths of this amplification on a logarithmic scale and cold-corrected human error one-fifth; given a loss of cooling-water flow, the probability that the human barrier had also failed is 0.82, against a prior of 0.085. Back-casting of five casualties supports the model structure, and the operational-data comparison is an in-sample calibration check. An expert survey (n = 16) shows high internal consistency and strong practical endorsement. A phased risk control option programme is estimated to reduce accident risk by 85%, cost-effective above USD 54 M per accident (USD 64 M discounted at 5%). The evaluation reported here is internal throughout: no polar casualty that is both machinery-initiated and cold-driven is available in the public record for external verification, so these figures establish the internal consistency of the model rather than its predictive accuracy, and H-PORA is offered as a prototype decision-support tool rather than an instrument for regulatory compliance audit.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Human error assessment and reduction for total electrical power failures at container ship under decomposed fuzzy analytical hierarchy processJournal of Marine Engineering & Technology · 2026
- A data-driven system-theoretic Bayesian network framework for probabilistic safety assessment of passenger vesselsReliability Engineering & System Safety · 2026
- Dynamic risk modelling of maritime accidents based on HFACS-PV and Bayesian NetworksOcean Engineering · 2026
- A three-dimensional fuzzy dynamic risk assessment model with dynamic cloud weights for human operational errors in oil and gas pipelinesPetroleum Science · 2026
- Hybrid modeling of grounding and collision risk for vessels not under commandFrontiers in Marine Science · 2026
- Integrated Human–Equipment Reliability Assessment of Ammonia Loss of Containment During Shore-to-Ship BunkeringJournal of Marine Science and Engineering · 2026