Capacity Expansion and the Capability–Defect Gap After Automating a Screw-Fastening Station: A Lean Six Sigma DMAIC Case Study in an Automotive Safety-Components Production Line
Eduarda Teixeira, António Rocha, Filipe Chaves
Key points
From the paper's conclusion- This study quantifies the capacity, equipment-effectiveness, process-capability and nonconformity effects of integrating an automated screw-fastening machine (OP8) into an assembly line.
Abstract
Background: Automotive safety-component suppliers often must add capacity at short notice, and automation is common. This study quantifies the capacity, equipment-effectiveness, process-capability and nonconformity effects of integrating an automated screw-fastening machine (OP8) into an assembly line. Methods: An Action-Research DMAIC study combined 2024 monthly capacity, OEE and nonconformity records with ordered 100-part series of fastening torque and nut height from the original equipment (OP6/OP7) and OP8 for two product variants, analyzed with I-MR charts, resolution-aware Anderson-Darling tests, normal and Weibull capability indices with confidence intervals, and Brown-Forsythe, Hodges-Lehmann, Cliff’s delta and Welch tests. Results: Rated capacity rose from 117 to 153 parts/h (+30.8%), of which 8 parts/h (22% of the gain) is attributable to OP8; OEE remained at 88.0–91.7%. Torque standard deviation on OP8 was 2.3–3.0 times that on OP6 (Brown-Forsythe p < 0.001), whereas nut-height spread was 11–23% lower. Poor screw-fastening reached 0.66% of OP8 output in June, July and September, about 21 times the OP6 rate, although no logged reading was out of specification. Conclusions: Capacity increased, but capability indices computed from machine-logged, apparently screened data neither explained nor predicted the attribute defect rate, and the defect reduction cannot yet be credited to the improvement actions.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Reliability improvement in CNC manufacturing through lean six sigma DMAIC: an empirical study on mean time between failuresScientific Reports · 2026
- Integrating Measurement-System Analysis and Statistical Process Control to Assess Capability Improvement of Thread Pitch Diameter in a CNC-Turned Stainless-Steel FittingMetrology · 2026
- Analisis Perbaikan Produktifitas Departemen Assembly Line Dengan Metode Tpm Dan Six Big Loss (Studi Kasus Pt Xxx Karawang Indonesia)Jurnal Siber Multi Disiplin · 2026
- Overall Equipment Effectiveness as a Strategic KPI in Intelligent Manufacturing: A Case Study in Plastic Injection MouldingJournal of Manufacturing and Materials Processing · 2026
- Reducing Warranty Claims and Defects in a Motorbike Industry of Bangladesh Using Lean Six SigmaSciEn Conference Series Engineering · 2026
- Leveraging Six Sigma DMAIC for Lean Implementation in Mechanical WorkshopsApplied Sciences · 2025