Flexibility Operating Region at TSO-DSO Interface Considering Small-Signal Stability
Darong Sorn, Raphael Caire, Vannak Vai, Jérôme Buire, Antoine Labonne
Key points
From the paper's conclusion- The results show that incorporating small-signal stability constraints reshapes the feasible P-Q boundary by excluding operating points that satisfy steady-state limits but are dynamically insecure.
Abstract
The swift integration of distributed energy resources (DERs) is transforming distribution networks by introducing bidirectional power flows and further enabling distribution systems to provide flexibility services to transmission networks. However, the transmission system operator (TSO) has limited visibility of DER capabilities because these resources are predominantly managed by the distribution system operator (DSO). This article proposes an optimization-based method for constructing an active-reactive power flexibility operating region at the transmission-distribution interface, considering both steady-state operating limits and small-signal stability constraints. The method aggregates the flexibility of downstream DERs and determines the operationally secure power exchange capability at the point of common coupling. The results show that incorporating small-signal stability constraints reshapes the feasible P-Q boundary by excluding operating points that satisfy steady-state limits but are dynamically insecure. Consequently, the proposed flexibility operating region provides a more accurate and reliable representation of the support capability available from the distribution network. This representation can enhance TSO-DSO coordination, facilitate reserve and flexibility management, and support the secure operation of power systems with high DER penetration under varying operating conditions.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Explicit Convex Inner Approximation of TSO-DSO Flexibility Regions via Exact Second-order Cone Relaxation in Radial NetworksarXiv · 2026
- Ensuring Grid-Safe Forwarding of Distributed Flexibility in Sequential DSO-TSO MarketsarXiv · 2026
- Leveraging DER Frequency Response for Enhanced Power System ResilienceIEEE Transactions on Smart Grid · 2025
- Challenges and applications of hosting capacity analysis in DER-rich power systemsApplied Energy · 2026
- Evaluating Congestion Zoning in DSO Flexibility Markets Using Sensitivity FactorsInternational Transactions on Electrical Energy Systems · 2026
- Risk-constrained optimization of joint spatio-temporal flexibility of mobile energy storage and data centers under uncertainties in distribution systemsEnergy Reports · 2025