Two-Stage Stochastic–Robust Scheduling of Cascade Pumping Stations with CVaR-Based Risk Control: An Eastern Route Case Study
Pengfei Wang, Chao Lu, Zhihan Shi, Guangming Zhang
Key points
From the paper's conclusion- Relative to the risk-neutral stochastic–robust configuration, adding CVaR reduced evaluated CVaR at the 95% confidence level by 21.71 CNY, approximately 0.0023% of the reference tail cost, while increasing mean cost by 6.70 CNY.
Abstract
Day-ahead scheduling of cascade pumping stations must balance electricity costs and delivery requirements under uncertainty. This study develops a two-stage stochastic–robust scheduling framework incorporating conditional value-at-risk (CVaR). A day-ahead reference flow is linked to bounded full-trajectory recourse, with probability-weighted demand scenarios, budgeted upward price deviations, and prescribed capacity derating. CVaR measures scenario-specific worst-price costs, and robust duality yields a deterministic-equivalent linear program. In a constructed five-station benchmark with 1000 synthetic out-of-sample demand trajectories, deterministic and stochastic configurations achieved scheduling-feasibility rates of 98.5% and 99.4%, respectively, whereas price-robust configurations achieved 100%. Lower worst-price costs primarily reflected reduced protection premiums; independently generated price trajectories did not establish realized-expenditure savings. Relative to the risk-neutral stochastic–robust configuration, adding CVaR reduced evaluated CVaR at the 95% confidence level by 21.71 CNY, approximately 0.0023% of the reference tail cost, while increasing mean cost by 6.70 CNY. Sequential-information restrictions increased costs, while demand and capacity stress tests removed universal sample feasibility. Delay–storage and nonlinear-power diagnostics exposed limitations of the physical approximations. The framework supports scheduling-level risk–economy analysis, but its small tail-risk benefit and constructed-case results do not establish operational effectiveness without hydraulic and field validation.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Chance-constrained receding-horizon medium-term cascaded hydropower schedulingInternational Journal of Electrical Power & Energy Systems · 2026
- Distributionally Robust Risk Dispatch for Integrated Electricity and Heating System Using Moment and Unimodal InformationEnergies · 2026
- Risk-Averse Procurement for Electricity Retailers Under Photovoltaic Prosumer Uncertainty in the New Power System: A Two-Stage Stochastic CVaR ApproachSustainability · 2026
- Multi-Timescale Coordinated Scheduling of Pumped Water Supply and Transfer Systems: Bridging Water Allocation, Economic Operation, and Hydraulic SafetyApplied Sciences · 2026
- Regime-Dependent Value of CVaR in Preventive Maintenance Scheduling under RUL UncertaintyarXiv · 2026
- Effect of Imbalance Settlement Design on Risk-Averse Aggregator Scheduling: A CVaR-Based Parametric StudyElectricity · 2026