Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas

Ziran Guo, Xiaolong Xiao, Xiaoxing Lu, Wenqiang Xie, Fangfang Zhu

Key points

From the paper's conclusion
  • These results support the timing improvement of the complete design.

Abstract

Interconnected low-voltage distribution areas share flexible resources for post-fault service restoration. Acquiring current support information and confirming candidate schedules compete for communication resources. This paper proposes query-cost-aware cooperative restoration scheduling to coordinate neighbor queries and the timely activation of feasible restoration instructions. Shared soft-open-point transfers couple local three-phase dispatch, photovoltaic utilization, battery operation, and load service. Cached responses guide pre-query selection using predicted dual improvement per estimated communication cost. Permanent power-balance equalities provide numerically certified curvature bounds, while current endpoint responses determine the updates. Cooperative instructions are activated after fixed-transfer optimization, nonlinear three-phase four-wire power-flow validation, battery-energy validation, and joint confirmation. Across the main paired simulations, the capped mean time to reach 90% of the reference restoration increment decreases from 20.93 to 17.05 s relative to the Full neighborhood value baseline. In branch-isolation scenarios, 240 of 240 traces attain the target within 60 s, compared with 204 for the baseline. Full query with matched curvature also attains all targets, with a mean time of 17.08 s. These results support the timing improvement of the complete design.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas — Science Skim