Energies

Onshore Wind Turbine Maintenance Strategies: A Structured Review and a Reproducible Monte Carlo Assessment of Reliability, Availability, and Lifecycle Costs

Mohamed Bousla, Thabet Mohammed Alzahrani, Saud Hameed Alotaibi, Najib El Ouanjli, Ali Haddi, Youness El Mourabit, Hilal Essaouini, Hassna Salime,

Computational

Key points

From the paper's conclusion
  • The results are comparative, scenario-based estimates intended to guide digital-monitoring investment rather than predictions for a specific farm.

Abstract

Effective maintenance management is essential for the reliability, availability and economic performance of onshore wind turbines. This study combines a structured review of corrective, preventive, condition-based (CBM), predictive (PdM) and opportunistic maintenance with a reproducible Monte Carlo assessment. The review covers strategy definitions, SCADA data quality and availability, scheduling models, onsite operations and environmental boundaries, and a 105-entry alarm-level fault catalogue covering 14 subsystems is coded to separate component failures from instrumentation faults, protective trips and operating restrictions. The checklist derived from the review parameterizes an event-driven simulation of a hypothetical 120 MW farm over 25 years in temperate, mountainous, coastal and desert environments, including spare-part inventory, crane lead times, crew dispatch and continuous weather windows. The model is calibrated to a field failure frequency of 1.8 failures per turbine-year and benchmarked against published reliability statistics; 100 paired replications give confidence intervals below EUR 0.06/MWh on strategy differences. For an identical wind resource, the preventive-maintenance LCOE ranges from EUR 53.23/MWh (temperate) to EUR 55.18/MWh (mountainous). Relative to preventive maintenance, CBM and PdM increase energy-based availability by 0.25–0.30 and 0.84–1.29 percentage points and reduce outage time by 14–19% and 45–47%, but under the assumed digital costs neither lowers LCOE. The admissible annualized digital cost is EUR 0.10–0.15 million/year for CBM and EUR 0.54–0.72 million/year for PdM, i.e., 71–80% and 39–54% below the assumed costs. About three quarters of the PdM advantage stems from the assumed warning time and detection performance rather than from predictive scheduling; class imbalance and domain shift of diagnostic models reduce it, higher spare-part and crane prices increase it, and longer supply-chain lead times reduce it because warnings shorter than the procurement time cannot be acted upon. The results are comparative, scenario-based estimates intended to guide digital-monitoring investment rather than predictions for a specific farm.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers