  • The results show that models omitting preventive maintenance and shock-type failures overstate electrolyser availability, with direct consequences for hydrogen supply planning and plant economics.

Abstract

Proton exchange membrane (PEM) water electrolysis is a key technology for converting renewable electricity into green hydrogen, and the availability of electrolyser stacks directly determines the hydrogen output and economics of such plants. This paper extends a previously reported ten-state semi-Markov reliability model of a PEM electrolyser into a twenty-state framework that better reflects field behaviour. The extension adds a derated, partial-output operating state for each of four degradation mechanisms (membrane, electrode, chemical and thermal), a spares-waiting state that separates logistics delay from active repair, a scheduled preventive-maintenance branch, and a rare catastrophic-shock branch, all treated as competing risks at the operative state. Closed-form steady-state expressions are derived for availability, mean time to system failure (MTSF) and maintenance-crew busy periods. A delta-method procedure converts sensitivity coefficients into a confidence interval on availability, and a profit function balances hydrogen revenue against inspection, derating, logistics and repair costs. Using plant rates from a pilot-scale electrolyser and literature-informed values for the new parameters, the model gives a steady-state availability of 0.8804 (95% CI: 0.778–0.983), a production-equivalent availability of 0.8856 that credits the output of derated states, an MTSF of about 5297 h and an illustrative net profit rate of $191.03/h after electricity cost. The results show that models omitting preventive maintenance and shock-type failures overstate electrolyser availability, with direct consequences for hydrogen supply planning and plant economics. Numerical Markov-chain solution and Monte Carlo simulation verify the closed-form results, and transient, sensitivity and operating-condition analyses identify membrane degradation as the mechanism whose maintenance matters most.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers