Coordinated Sizing of Transformer and Hybrid Energy Storage Systems for PV-Integrated Ultra-Fast EV Charging Stations Considering Battery Degradation
Hao Zhang, Haiwei Wang, Lu Chen, Yang Zhang, Yu Liu, Yong Shi
Key points
From the paper's conclusion- The results demonstrate that the proposed coordinated sizing framework can simultaneously reduce infrastructure capacity requirements and operating costs, improve grid integration performance, and alleviate battery cycling degradation in PV-integrated ultra-fast charging stations.
Abstract
Ultra-fast charging stations can impose substantial short-term power fluctuations and high transformer capacity requirements on distribution networks. To address the coupled planning and operational challenges of such stations, this study proposes a planning-operation coordinated sizing framework for a photovoltaic-integrated ultra-fast charging station. Unlike many existing approaches that address transformer sizing, energy storage configuration, and battery degradation separately or only partially couple them, the proposed framework jointly determines transformer capacity, battery capacity, and supercapacitor capacity while incorporating battery cycling degradation into the long-term storage cost evaluation. Representative charging scenarios are extracted from historical charging-load data and used for capacity planning. At the planning level, the average daily comprehensive cost is minimized by coordinating transformer investment, hybrid energy storage investment, operating cost, and degradation-dependent battery lifetime. At the operation level, battery and supercapacitor dispatch is optimized considering both operating economy and grid-connected power fluctuation. The upper-level sizing problem is solved using quantum-behaved particle swarm optimization. Sobol-sequence initialization and a nonlinear contraction-expansion coefficient are adopted in the implementation to enhance the distribution of the initial population and adjust the search range during the iterative process. The lower-level mixed-integer linear programming problem is solved using Gurobi. In the studied commercial-area case, the proposed hybrid energy storage configuration reduces the transformer capacity from 326 kVA to 201 kVA. Compared with the no-storage scheme, total costs are reduced by 14.9% and 14.3%, while the absolute deviations of grid-connected power are reduced by 93.4% and 94.8% for the two representative days. Compared with battery-only storage, daily battery cycle counts are further reduced by 60.5% and 65.2%. The results demonstrate that the proposed coordinated sizing framework can simultaneously reduce infrastructure capacity requirements and operating costs, improve grid integration performance, and alleviate battery cycling degradation in PV-integrated ultra-fast charging stations.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Optimized Grid–Source–Station–Charger Coordinated Planning Method for Electric Heavy-Duty TruckEnergies · 2026
- Flattening Winter Peaks with Dynamic Energy Storage: A Neighborhood Case Study in the Cold Climate of Ardahan, TurkeySustainability · 2026
- Concurrent planning of ultra-fast EV charging infrastructure, intermittent PV, and DSTATCOM in a reconfigured three-phase unbalanced distribution systemInternational Journal of Ambient Energy · 2025
- Joint planning–control optimization of EV charging stations, battery energy storage, and DSTATCOMs in distribution networksScientific Reports · 2026
- Optimal Sizing and Placement of Photovoltaic, Battery Energy Storage and EV Charging Stations in Distribution Networks Using a Hybrid Swarm Intelligence AlgorithmEnergies · 2026
- Optimal Sizing of a Renewable Hybrid Power System in a Standalone House Considering Vehicle-to-Home IntegrationBatteries · 2026