Low-Carbon Optimal Scheduling of High-Altitude Construction-Park Integrated Energy System Considering Truck–Grid Interaction
Zhijian Liu, Cheng Cheng, Xudong Yang, Shijie Huang
Key points
From the paper's conclusion- To address these issues, this study proposes a low-carbon optimal dispatch method incorporating truck–grid interaction for a high-altitude construction-park integrated energy system (HACP-IES).
Abstract
As green power systems continue to develop, an increasing number of power generation and energy storage facilities are being constructed in high-altitude regions. However, existing microgrid-based energy supply architectures in high-altitude construction parks face low energy utilization efficiency, high carbon emissions, and inadequate accounting for market-related costs. To address these issues, this study proposes a low-carbon optimal dispatch method incorporating truck–grid interaction for a high-altitude construction-park integrated energy system (HACP-IES). First, a coupled waste heat recovery–organic Rankine cycle–power-to-gas (WHR–ORC–P2G) model and a multi-state transition model for construction electric heavy-duty trucks (CEHTs) are developed to enable the cascade utilization of waste heat and coordinated operation of mobile energy storage. Second, a dynamic green certificate–carbon trading interaction mechanism and multi-energy demand response are introduced to exploit flexibility through market incentives and demand-side adjustments, while wind and photovoltaic forecast uncertainties are addressed using chance constraints under a normal distribution assumption. Finally, a multi-objective mixed-integer linear programming model is formulated and solved, with normalized linear weighting used to balance operating cost and actual carbon emissions. Comparative analyses across multiple scenarios show that, with all coordinated resources participating, the proposed method reduces operating cost and carbon emissions by 78.02% and 32.22%, respectively, relative to the benchmark, thereby improving both the economic and low-carbon performance of the park’s energy system.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Two-Stage Distributionally Robust Optimization Scheduling for Industrial Park Integrated Energy Systems Considering Tiered Carbon Trading and Renewable Energy UncertaintyEnergies · 2026
- Low-Carbon Economic Dispatch of Integrated Energy System Considering Electricity-Hydrogen Coupling and Green Certificate-Carbon Trading SynergyDOAJ (DOAJ: Directory of Open Access Journals) · 2026
- Optimizing Industrial Park Power–Hydrogen–Thermal Systems for Low-Carbon Economy: Accounting for Nonlinear Polarization and Waste-Heat UtilizationProcesses · 2026
- Multi-time scale coordinated dispatch of integrated electricity-hydrogen-heat microgrids with waste heat recoveryInternational Journal of Electrical Power & Energy Systems · 2026
- Robust Coordinated Reserve Optimization Method for Electricity–Gas Systems Considering Multi‐Source Coupling and Multiple UncertaintiesEnergy Science & Engineering · 2026
- Optimization of a refined power-to-gas integrated energy system considering reward-penalty stepped carbon trading mechanismEnergy Reports · 2026