Drones

Kernel-Level Spectral Gain Scheduling and Hysteretic Topology Management for a USV Formation Kernel

Xingda Li, Jianqiang Zhang, Bo Zhang, Ling Tan, Pengfei Zhang

Key points

From the paper's conclusion
  • New experiments close the loop end-to-end: an integrated hysteresis–scheduling–ADRC loop holds the observer factor near 8× across a star → mesh → star reconfiguration, hub-fault recovery gives a 10× lower peak and 1.6× faster settling than PD, and the rejection advantage holds at matched feedback authority, with the accuracy–effort trade-off against PD and LQR baselines quantified explicitly; the

Abstract

This paper studies three computational kernels of a digital-twin prototype for USV formations—a cyclic Jacobi routine for algebraic connectivity, a connectivity-driven formation-gain scheduler, and a hysteretic topology selector—verified through kernel-level spectral checks, frozen-topology linear consensus, and graph-level switching and fault analysis. First, the Jacobi routine’s 45∘ equal-diagonal rotation matches symmetric eigensolutions on star, complete, and implementation-specific graphs of order 3–13 to 1.60×10−14. Second, for a frozen connected graph of m vessels, the scheduled gain k(λ2)=clamp(m/λ2,0.5,4) yields kλ2=min{m,4λ2}, hence m/8≤kλ2≤m on λ2∈[m/32,m]. Third, with M constant-utility candidates and bounded observation noise, 2σ<ΔU makes every accepted switch a strict ascent, permitting at most M−1 switches. Fourth, an isolation fault, via distinct full-diagnostic and online graphs, leaves a seven-vessel complete graph with λ2=0, while a re-elected star on six online vessels recovers λ2=1 and 1.667 versus 5.000 messages per agent. Finally, a scalar ADRC stress test and its multi-agent extension show estimation-based rejection (∼7.5×) and gain re-scheduling (∼4.1×) act independently for a combined ∼31× reduction in steady-state disagreement, with a switched-loop corollary bounding disagreement under finitely many switches at the frozen-topology rate. New experiments close the loop end-to-end: an integrated hysteresis–scheduling–ADRC loop holds the observer factor near 8× across a star → mesh → star reconfiguration, hub-fault recovery gives a 10× lower peak and 1.6× faster settling than PD, and the rejection advantage holds at matched feedback authority, with the accuracy–effort trade-off against PD and LQR baselines quantified explicitly; the switched-loop corollary is stated for the full state (disagreement, relative velocities, observer errors) at rate min{μ,ω0} consistent with the observer’s response speed.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Kernel-Level Spectral Gain Scheduling and Hysteretic Topology Management for a USV Formation Kernel — Science Skim