Research on the Prefabricated Design Method for Small and Medium Cross-Section Utility Tunnels Based on Keyway–Bolt Connection
Fan Yang, Xiaoyong Luo, Fei Ma, Zuting Zhuo, Chengbin Wu
Key points
From the paper's conclusion- The method coordinates component standardization with route adaptation and demonstrates potential to simplify on-site operations, providing a reference for the prefabricated design of utility tunnels with small and medium cross-sections and similar underground box structures.
Abstract
Prefabricated utility tunnels combine factory production with on-site assembly to reduce on-site wet work and improve component quality and construction efficiency. Standardized design workflows and segment layouts coordinated with production, transport, and lifting conditions are essential for the practical application of integral precasting. To address insufficient coordination among cross-sectional dimensions, longitudinal segmentation, and assembly interfaces in utility tunnels with small and medium cross-sections, this study proposes a design method combining integral cross-sectional precasting with longitudinal segmentation. The workflow integrates cross-section definition, route segmentation, interface standardization, and feasibility checks. A keyway–bolt connection and composite joint waterproofing scheme are also proposed. Four drainage box-culvert types at Changsha Airport are used to illustrate the proposed design workflow. For a selected 50 m reach of the single-cell Type A culvert, the estimated cumulative on-site stage duration for the proposed precast scheme was 82.1% lower than the recorded cast-in-place total when curing-related waiting was included. The comparison assumes sequential on-site operations and excludes factory production and transport. The method coordinates component standardization with route adaptation and demonstrates potential to simplify on-site operations, providing a reference for the prefabricated design of utility tunnels with small and medium cross-sections and similar underground box structures.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Experimental study on flexural performance of a novel prefabricated bent‐up reinforcement dowel connection for accelerated secondary lining constructionStructural Concrete · 2026
- Full-scale investigation into top-down construction of fully prefabricated structures retaining deep excavationCanadian Geotechnical Journal · 2026
- Structural Behavior of Prefabricated Concrete Wall Panels and Their Connections: A State-of-the-Art and Practice ReviewBuildings · 2026
- Novel prefabricated joints for underground silos with steel cavity and concrete-filled cavity: Axial compression tests and numerical simulationsPLoS ONE · 2026
- ZaB–Zentrum am Berg: Research for New Underground SolutionsEPJ Research Infrastructures · 2026
- A BIM-Based Framework for High-Risk Concrete Formwork Support System Design Considering Multi-Component Load CouplingApplied Sciences · 2026