Construction Equipment Safety Assessment and Prioritization Using an Integrated CECSI–MARCOS Framework
Tolga Barışık
Key points
From the paper's conclusion- This study proposes a two-stage, observation-based Construction Equipment Complexity and Safety Index (CECSI) integrated with the Measurement of Alternatives and Ranking according to COmpromise Solution (MARCOS) method for equipment category intervention prioritization.
Abstract
Construction equipment safety involves concurrent technical, environmental, human, operational, and organizational conditions. This study proposes a two-stage, observation-based Construction Equipment Complexity and Safety Index (CECSI) integrated with the Measurement of Alternatives and Ranking according to COmpromise Solution (MARCOS) method for equipment category intervention prioritization. The framework was applied to 200 field observations across four residential construction sites and five equipment categories. Eighteen indicators were rated on a five-point observational ordinal scale and organized into five equally weighted dimensions. Four prespecified pairwise interaction terms were combined through a bounded nonnegative increment (λ = 0.20). Six equally weighted, field-derived MARCOS criteria were used without expert elicitation or fuzzy weighting. The revised mean CECSI was 62.19, and 89.0% of the observations fell within the proposed High/Critical screening bands. Tower cranes had the highest equipment category intervention priority; sensitivity analyses identified dependence on screening thresholds and the interpretation of intervention difficulty. The CECSI is an interpretable operational screening index, not an empirically calibrated measure of accident probability. The approach offers a transparent observation-to-prioritization workflow while requiring further measurement and external validation.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Risk-Controlled Applicability Set Retrieval for Regulation-Grounded Construction-Site Visual ScreeningBuildings · 2026
- Evidence Before Optimization: Maintenance Prioritization by Evidence Sufficiency in Compressed-Air SystemsApplied Sciences · 2026
- An Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision SupportBuildings · 2026
- Explainable Emergency Response Recommendation for Foundation Pit Collapse Accidents: An LLM-Enabled E/B/R Ontology-Driven Hybrid Reasoning FrameworkBuildings · 2026
- Prioritizing Critical Risk Factors for Scaffolding Operations: An Expert-Based Analytic Hierarchy Process Study in TaiwanBuildings · 2026
- Retrieval-Augmented Inspection Recommendations from Accident Cases and Technical StandardsElectronics · 2026