Electricity Load Forecasting for 400 Public Buildings in Shenzhen: Model Comparison, Feature Selection, and TreeSHAP Interpretation
Dongfang Yang, Kaisan Li, Yuhang Zhang, Tengyue Yang, Zhuoyue Shen, Zike Xu, Yi Zhang
Key points
From the paper's conclusion- These findings concern later-period forecasting for the same 400 Shenzhen buildings within 2021.
Abstract
One-hour-ahead electricity-load forecasting offers a potential reference for near-term demand monitoring, while its practical implementation requires a balance between predictive performance and input-data requirements. This study develops one-hour-ahead forecasting models using 3,504,000 hourly observations from 400 public buildings in Shenzhen, China, over the full calendar year of 2021. One pooled model was fitted for each algorithm after chronological splitting within every building: the earliest 80% of records formed the training period and the latest 20% formed an isolated test period. Thirty-five predictors described building characteristics, target-hour calendar information, the most recent completed weather observations, socio-spatial context, and previous-day load profiles. Five-fold expanding-window cross-validation within the training period was used for preprocessing decisions, Bayesian hyperparameter optimization, model selection, feature ranking, and recursive feature elimination (RFE). After the candidate configurations were locked, they were refitted on the complete training period and evaluated once on the held-out test observations. CatBoost achieved the best 35-feature test performance (R2 = 0.945). Training-period RFE selected a 12-feature configuration, which achieved R2 = 0.948 on the held-out test set. A four-feature configuration comprising building area, target hour, previous-day peak load, and previous-day valley load achieved R2 = 0.901. TreeSHAP identified building scale, intraday schedule, and recent load-profile descriptors as the dominant predictive signals. These findings concern later-period forecasting for the same 400 Shenzhen buildings within 2021. Transfer to unseen buildings, other cities, or other years was not evaluated; SHAP attributions represent predictive associations rather than causal effects.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Machine Learning and Time-Series Foundation Models for Day-Ahead Electricity Forecasting in a University BuildingarXiv · 2026
- Cross-Zonal Short-Term Load Forecasting in Resource-Constrained Distribution Grids: A Multi-Model Benchmarking StudyElectricity · 2026
- Adaptive Clustering and Deep Learning-Based Model for Predicting Large-Scale Heterogeneous Building Load ProfilesBuildings · 2026
- Building-PROFet: A scalable data-driven modelling approach for estimating heat and electricity load profiles of buildingsEnergy · 2026
- Enhancing residential load forecasting accuracy through dynamic feature selection and ensemble machine learning models: A real-world scenario in Southern FinlandEnergy and Buildings · 2025
- Enhancing Power System Flexibility Using AI‐Based Forecasting Techniques: A Comparative StudyBattery energy · 2025