Tianjiao Zhao, Ri Na
Despite the widespread adoption of BIM, information exchange across disciplines remains hindered by heterogeneous structures at the tabular data level, particularly when integrating data across multiple discipline-specific models. Manual mapping, rigid templates, or one-off programming scripts are labor-intensive and difficult to scale, limiting automated querying, cross-model aggregation, and schedule-level analytics. This study proposes a lightweight, workflow-driven approach for semantic normalization and cross-model integration of BIM schedule data, with optional script-supported workflow configuration used only to assist the configuration of deterministic, rule-guided mapping logic, rather than serving as a core analytical method. By introducing a customizable subcategory layer, the workflow enables fine-grained semantic alignment and efficient normalization across diverse schedule datasets, implemented through lightweight Python scripting and rule-guided semantic matching used solely as a supporting mechanism for deterministic field mapping. Using structural, architectural, and HVAC models, we demonstrate a stepwise process including data cleaning, hierarchical classification, consistency checking, batch analytics, and automated computation of cross-model metrics such as opening-to-wall ratios. Sample-based validation confirms the workflow’s reliability, achieving semantic mapping agreement rates above 95% and reducing manual processing time by more than 85%. The workflow is readily extensible to other disciplines and modeling conventions, supporting high-throughput data integration for tasks such as design coordination, semantic alignment, RFI reduction, accelerated design reviews, and data-driven decision making. Overall, rather than introducing a new algorithm, the contribution of this work lies in formalizing a reusable, schedule-level workflow abstraction that enables consistent semantic alignment and automated cross-model aggregation without relying on rigid ontologies or training-intensive learning-based models. Any optional tooling used during workflow configuration is auxiliary and does not constitute a standalone learning-based method requiring model training or performance benchmarking. This provides a reusable methodological foundation for scalable, schedule-level BIM data integration and cross-model analytics.