Reservation-Aware Cooperative Edge Scheduling Under Stale Resource Information for Mobile Industrial IoT
Xiangze Li, Zihan Lian, Zhenshun Guo, Jialun Wang, Xin Chen, Chuan Lin
Key points
From the paper's conclusion- We propose reservation-aware cooperative edge scheduling (RACE), which reconstructs the virtual gateway queue by replaying the controller’s own assignments from the latest available report.
Abstract
Mobile inspection devices generate batches of sensor data whose results are useful only if they return before an application deadline. A controller can divide independent processing windows between the device and nearby gateways, but its periodic gateway reports describe previously reserved work and can be outdated by the next assignment. We propose reservation-aware cooperative edge scheduling (RACE), which reconstructs the virtual gateway queue by replaying the controller’s own assignments from the latest available report. The replay accounts for when uploaded inputs become available, and age-stratified margins address the residual queue error. A bounded integer allocator then assigns whole windows while accounting for contact duration, transfer setup and result aggregation. Across 54 distinct environment configurations, RACE achieves 96.39% complete-batch deadline completion, 13.18 percentage points above cached-state scheduling, with a mean online decision time of 0.463 ms in the simulation. These results quantify the value of tracking known commitments under a fixed reporting budget.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Characterizing Effective Computing Capacity and Online Task Assignment in Heterogeneous Oilfield Cloud–Edge SystemsApplied Sciences · 2026
- Lyapunov Optimization with Virtual Queues for adaptive task offloading in multi access edge computingDiscover Computing · 2026
- Telemetry-Quality-Aware Distributionally Robust Risk-Constrained Resource Allocation for Edge AI Inference Under Non-Stationary WorkloadsMathematics · 2026
- Joint Freshness and Deadline Feasibility in Store-and-Forward Satellite IoT NetworksarXiv · 2026
- FPTR: Feasibility-Preserving Transactional Refinement for Deadline-Constrained Joint Beam and Resource AllocationarXiv · 2026
- Dual-Loop Resilient Scheduling with Predictive Path Reconfiguration for Deterministic Industrial Wireless Networks.Sensors (Basel, Switzerland) · 2026