Study of Surface Dewatering Effects and Deformation Control of Tunnels in Water-Rich Completely Weathered Granite Strata
Bo Zhang, Shaozhan Yang, Jiawei Xu, Jianghe Xin, Xiaoyong Cao, Yukun Li
Key points
From the paper's conclusion- The results demonstrate that reducing well spacing (from 22 m to 7 m) promotes a progressively continuous and gentle drawdown funnel.
Abstract
Tunnel construction in completely weathered granite strata with rich water storage is potentially risky and can lead to catastrophic hazards without proper engineering measures. This study investigates the mechanisms of key surface dewatering parameters—well spacing, dewatering depth, and well–tunnel distance—on the groundwater-level field, stress field, and displacement field, as well as their control efficacy with respect to tunneling-induced deformation, based on three-dimensional finite element analysis and field monitoring. The results demonstrate that reducing well spacing (from 22 m to 7 m) promotes a progressively continuous and gentle drawdown funnel. The maximum surface settlement induced by dewatering to 20 m below the ground surface increases from 3.5 cm to 5.0 cm when the well spacing changes from 22 m to 7 m, while excavation-caused deformation decreases and the surface settlement trough evolves from discrete “crest-shaped” patterns to a continuous “U-shaped” profile, accompanied by an increase in total settlement. Increased dewatering depth enhances the effective stress in the soil but also significantly expands the extent of consolidation settlement and shear strain. The well–tunnel distance critically influences the effectiveness of dewatering in controlling the tunnel-adjacent zone. Surface dewatering, through a synergistic “pressure relief–consolidation” mechanism, systematically improves the geotechnical properties of strata by both reducing hydrostatic loads and enhancing soil resistance. Based on derivations from discrete simulated cases, a recommended dewatering design is proposed for similar water-rich weak-stratum tunnel projects, with well spacings of 11 m to 15 m and dewatering depths extending to approximately the tunnel invert level. These recommendations provide a reference for dewatering design and construction control in related engineering contexts comparable to the present case study.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Dynamic evolution characteristics and laws of ground settlement due to shield tunneling in water-rich sandy pebble strataFrontiers in Earth Science · 2026
- Development of surface settlement under the combined effect of foundation pit dewatering and excavation: Insights from experimental modellingUnderground Space · 2025
- Deformation Behaviour of a Large-Span Variable-Section Foundation Pit Considering the Combined Effects of Dewatering Seepage and Soil CreepApplied Sciences · 2026
- Deformation Characteristics of Adjacent Subway Station and Buildings Induced by Deep and Large Foundation Pit Excavation in Loess Under Dewatering ConditionsBuildings · 2026
- Case study on pressure filled karst cave detection, tunnel construction simulation, and disaster risk assessment in karst development areasScientific Reports · 2026
- Deformation Control and Structural Performance of a Double- Sidewall Pilot Tunnelling Method with Reserved Rock Walls: A Case Study of a Large-Span Tunnel in Grade V Weak RockBuildings · 2026