From the paper's conclusion
  • The integrated framework, therefore, provides relative reconstruction priorities and complementary mechanical information for the investigated pipeline corridor under the defined multi-hazard scenarios.

Abstract

Urban water distribution pipelines are critical for service continuity, public health and post-disaster recovery. However, municipalities often lack practical tools for prioritizing reconstruction under interacting natural hazards. This study applies the Reconstruction Index-Based Sustainable Infrastructure Management (RI-SIM) framework at street scale to prioritize buried water pipeline segments exposed to earthquake and flood hazards. A real pipeline corridor in Torbalı, İzmir, Turkey, was selected as the case study. Flood susceptibility along the pipeline corridor was assessed using the Height Above Nearest Drainage (HAND) method. Three-dimensional finite element analyses were then performed for representative pipeline layout configurations under earthquake-only and combined earthquake–flood-related scenarios to quantify structural response using maximum principal stress. RI-SIM integrated pipe diameter, material type, pipe age and failure history within the physical component (A1); seismic demand, HAND-based flood susceptibility and flood-related soil changes within the hazard–structural component (A2); and functional importance (A3). Component and sub-criterion weights were determined using the Analytic Hierarchy Process (AHP), and the resulting normalized component scores were integrated in a Geographic Information System environment. The main distribution pipeline showed the highest RI-SIM score of 0.931 and was classified as very high priority, followed by the secondary connection pipeline with a score of 0.789 and high priority, and the pumping/transmission line with a score of 0.633 and moderate priority. Under the combined earthquake–flood-related scenario, the side-by-side configuration exhibited the largest increase in maximum principal stress, from 141 kPa to 621 kPa, indicating a pronounced configuration-dependent response. The integrated framework, therefore, provides relative reconstruction priorities and complementary mechanical information for the investigated pipeline corridor under the defined multi-hazard scenarios.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Risk Prioritization of Buried Urban Water Pipelines Under Multi-Hazard Conditions: Reconstruction Index-Based Sustainable Infrastructure Management (RI-SIM) — Science Skim