Joint Network Slice Scheduling and Energy Sourcing for Solar-Powered 5G Base Stations Under Battery Degradation Cost
Taeyoon Kim
Key points
From the paper's conclusion- In simulation over 116 held-out days driven by hourly irradiance data, across a range of grid capacities and on lithium iron phosphate and nickel manganese cobalt batteries, JOSS lowers the daily electricity cost, battery replacement included, by 15.1–16.3% and 10.8–11.3% relative to the best of four rule-based methods, by 11.2–12.5% and 7.9–10.8% relative to a soft actor–critic method trained on
Abstract
Many decision variables enter the operation of a 5G radio access base station. Network slice scheduling and energy sourcing are two of the most prominent. Slice scheduling has extended beyond meeting the QoS requirement of each slice to schedules that also account for energy efficiency, and energy sourcing optimisation takes the power consumption as an input and selects the least costly combination of grid, photovoltaic, and battery supply. Although power consumption is common to both decisions and determines the operating cost, slice scheduling and energy sourcing are optimised separately in the literature. Slicing schedulers concentrate on minimising consumption without considering the source of supply, and energy management concentrates on the supply without scheduling the slices. This paper proposes JOSS (Joint Optimisation of Slice and Sourcing), which optimises slice scheduling and power sourcing jointly against a single energy-cost objective, while respecting the QoS requirement of every slice. The objective accounts for the electricity the base station draws and for the degradation of the battery. JOSS minimises the long-run average cost online by Lyapunov drift-plus-penalty, using only the current state and requiring neither a forecast nor a learned model. In simulation over 116 held-out days driven by hourly irradiance data, across a range of grid capacities and on lithium iron phosphate and nickel manganese cobalt batteries, JOSS lowers the daily electricity cost, battery replacement included, by 15.1–16.3% and 10.8–11.3% relative to the best of four rule-based methods, by 11.2–12.5% and 7.9–10.8% relative to a soft actor–critic method trained on the same objective, and by 3.1–4.3% and 3.1–3.6% relative to a model predictive controller that uses a forecast, within the delay allowances of the two latency-bound slices and with a shortfall of the delay-tolerant slice below 0.01 GB per day.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data CentersarXiv · 2026
- Carbon-Aware Joint Resource and Energy Scheduling for Cellular Base StationsarXiv · 2026
- Energy-efficient scheduling of low-carbon heterogeneous energy-integrated virtual power plants with 5G base station energy storage participationInternational Journal of Electrical Power & Energy Systems · 2025
- Adaptive learning guided dual-function scheduling for delay-bounded quality of service in energy-constrained fifth-generation network slicesEngineering Applications of Artificial Intelligence · 2026
- Adaptive weighted multi-objective battery storage optimization in virtual power plant-controlled networks integrating electric vehicles and photovoltaicsApplied Energy · 2026
- Machine Learning Surrogates for Congestion Prediction and Risk-Constrained Battery Energy Storage Scheduling in PV Integrated Distribution NetworksSustainability · 2026