Pre-Contact Deployment Dynamics and Multi-Objective Optimization of a Miura-Ori-Folded Webbing Net
Lu Gu, Wenhui Shi, Feng Zhou, Chengxin Du, Zhonghua Du, Xi Chen
Key points
From the paper's conclusion- These results clarify the distinct roles and coupled effects of the principal towing-body parameters and provide a basis for selecting deployment conditions for Miura-Ori-folded flexible webbing nets.
Abstract
Reliable pre-contact deployment is a prerequisite for flexible-net capture of non-cooperative space targets. For a finite-width webbing net stowed in a Miura-Ori configuration, two issues are central to the deployment analysis: the prescribed crease geometry must be made compatible with the porous webbing topology, and the finite-width deformation of the webbing strips must be represented during their large spatial motion. This study develops an integrated framework for folded-configuration construction, nonlinear deployment analysis, and deployment-parameter optimization. A topology-compatible crease–strip mapping is introduced to generate a deterministic Miura-Ori folded configuration, and a membrane-element finite-element model is established to describe the large-deformation deployment of the webbing net. The model is evaluated against two independent ground deployment tests and subsequently applied to deployment under idealized vacuum and microgravity conditions. The individual and coupled effects of towing-body initial velocity, deployment angle, and towing-body mass are characterized using response-surface modeling, followed by multi-objective optimization of the deployment performance. The results show that deployment angle has the strongest influence on deployment distance and form-holding characteristics, whereas initial velocity primarily controls the temporal evolution of deployment, and towing-body mass has a comparatively weaker effect within the investigated parameter range. The Pareto analysis reveals a pronounced trade-off between maximum deployed area and the distance- and form-holding-related performance measures. These results clarify the distinct roles and coupled effects of the principal towing-body parameters and provide a basis for selecting deployment conditions for Miura-Ori-folded flexible webbing nets.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- From Paper to Space: Origami Patterns for Deployable Structures in Astronomy and Space ExplorationProceedings of the International Astronomical Union · 2026
- Geometry-Mechanics Compatibility Enables Interpretable Inverse Design of Non-Rigid Origami.Research (Washington, D.C.) · 2026
- A Novel Beveled Conical Deployable SunshieldJournal of Physics: Conference Series · 2026
- Design, Kinematic Analysis, and Static Analysis of a Modular Spaceborne Planar Array Antenna Deployment MechanismJournal of Physics: Conference Series · 2026
- Structural Design of a Three-Fold Radial-Rib Deployable Antenna Actuated by a Scissor-Type Annular TrussJournal of Physics: Conference Series · 2026
- Bistable origami robot for adaptive multimodal motion actuated by nonuniform magnetic fieldsNature Communications · 2026