From public innovation procurement requirements to AI-enabled socio-technical architecture: a longitudinal case study in industrialized housing.
Alberto Cerezo-Narváez, MCarmen Guerrero Delgado, Magdalena Ramírez-Peña, Daniel Sánchez-García, José Sánchez Ramos
Department of Mechanical Engineering and Industrial Design, Project Management and Engineering Research Group, University of Cadiz, Puerto Real, Spain. · Department of Energy Engineering, Termotecnia Research Group, University of Seville, Seville, Spain.
Key points
From the paper's conclusion- We do not evaluate a completed system or establish operational effectiveness, scalability, or broader public outcomes.
Abstract
Artificial intelligence (AI) is used in digital systems that combine data, computational methods, decision processes, and organizational arrangements. This paper examines how the requirements and institutional conditions of a public innovation procurement process are reflected in the development and specification of an AI-enabled socio-technical architecture for industrialized public housing delivery. The case concerns an AI-enabled system intended to support the design, assessment, and procurement preparation of industrialized housing within a public-sector delivery process. Using a longitudinal qualitative pre-deployment case-study design, we analyze a documentary corpus covering institutional procurement records, the initial technical proposal, its formal ex-ante assessment, and subsequent collaborative development. The architecture documented in the case comprises eight interconnected functional modules and three cross-cutting enablers: security, governance, and interoperability. It combines rule-based regulatory and contextual checking, generative and parametric design configuration, surrogate-model-supported performance estimation, cost and financial assessment, multi-objective optimization, multicriteria scenario comparison, and procurement-document generation. Across the corpus, we identify traceable correspondences between institutional requirements and functional, computational, governance, and interoperability arrangements, while keeping requirements, specifications, formal ex-ante assessment, subsequent development, and evidence requiring operational validation distinct. The contribution is an account of how AI-related and other computational capabilities are integrated with data, human decision points, governance arrangements, and procurement outputs within an evolving socio-technical architecture. We do not evaluate a completed system or establish operational effectiveness, scalability, or broader public outcomes. It provides a pre-deployment account of how procurement and institutional requirements correspond to the architecture of an AI-enabled decision-support system for industrialized housing delivery.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- AI in Smart Buildings and Construction 4.0: Implementation areas and influencing factors in construction organizationsAutomation in Construction · 2025
- Using Generative AI-Powered Sustainable Building Bots for Regulatory Intelligence and Sustainability Assessment of Construction: Lessons from Hong KongJournal of Urban Technology · 2025
- From Chatbots to Coordinated Agents: A Construction Management (CM) Taxonomy of Agentic AI Design Patterns2026
- Innovators and Transformers: From policy to public value: how procurement governs AI adoption in US State governmentInternational Journal of Physical Distribution & Logistics Management · 2026
- AI-Augmented Offsite Construction: Exploring Utility Theory and Boundary Objects for Design and Cost OptimisationAppliedMath · 2026
- Configurational pathways to smart city AI adoption: Evidence from local governments in Australia, Hong Kong, Saudi Arabia, Spain, and the United StatesCities · 2026