Frontiers in artificial intelligenceOpen accessSupply chain

SpectralGuard: a Spectrally grounded λ-SHAP framework for XAI validity certification in pharmaceutical supply chain networks.

Ntebogang Dinah Moroke, Mmapula Merriam Lebele

North-West University, Potchefstroom, South Africa.

Key points

From the paper's conclusion
  • We introduce SpectralGuard, demonstrated on a calibrated synthetic DGP driven by real Eskom load-shedding and SARB ZAR/USD records ( n = 3, 227 business days, 2014–2026); all spectral results are from the synthetic hypergraph. λ-SHAP shrinks attributions toward a fluid-regime prior using λ 2 ( t ) as the shrinkage weight, maintaining auditability at an explicit bias–variance cost (Remark 3.12).

Abstract

Permutation-based explainability methods such as SHAP are central to regulatory compliance in AI-governed pharmaceutical supply chains across Sub-Saharan Africa, yet their validity depends on a structural property that existing frameworks do not monitor: the algebraic connectivity of the supply hypergraph, quantified by the Fiedler eigenvalue λ2. We prove that λ2 → 0 is a sufficient condition for permutation-based XAI failure (Theorem 3.5): no increase in sampling effort can recover validity once network connectivity collapses. We introduce SpectralGuard, demonstrated on a calibrated synthetic DGP driven by real Eskom load-shedding and SARB ZAR/USD records (n = 3, 227 business days, 2014-2026); all spectral results are from the synthetic hypergraph. λ-SHAP shrinks attributions toward a fluid-regime prior using λ2(t) as the shrinkage weight, maintaining auditability at an explicit bias-variance cost (Remark 3.12). A probabilistic validity certificate V(t) combines four spectral metrics with SHA-256 tamper-evidence. An oracle experiment (B = 500, Seed = 2,026) demonstrates 70.4-89.2% attribution MSE reduction across governance regimes. The spectral gate is the decisive ablation component. In the synthetic DGP, early-warning detection leads classical baselines by 19 business days (λ c alert preceding the λ m crossing). Field validation on real CCMDD procurement data is planned for 2027 (PLMIF-2). A nine-step DHIS2 integration pathway supports SDG 3, 9, 13, and 16.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers