New quality productive forces-empowered neutrosophic group decision-making approach for engineering cost risk assessment: evidence from farmland water conservancy projects
Xiaorong Wu, Xu Chen
Key points
From the paper's conclusion- Results To demonstrate the feasibility and effectiveness of the proposed SVNN-LogTODIM method, a detailed numerical example concerning engineering cost risk evaluation for farmland water conservancy construction projects supporting high-standard agricultural production is conducted.
Abstract
Introduction Engineering projects are typically characterized by large investment scales, prolonged construction periods, and substantial uncertainty, making cost management inevitably exposed to various risks. In the context of new quality productive forces, engineering cost risk evaluation involves multiple conflicting attributes and the judgments of multiple decision-makers, and can therefore be formulated as a multi-attribute group decision-making (MAGDM) problem. Methods Considering the inherent ambiguity and uncertainty involved in evaluating engineering cost risks under new quality productive forces, single-valued neutrosophic sets (SVNSs) are employed to represent uncertain assessment information more comprehensively. Meanwhile, the Logarithmic TODIM (LogTODIM) method is introduced to capture the bounded rationality and psychological behavioral characteristics of decision-makers during the evaluation process. On this basis, an integrated single-valued neutrosophic number-based LogTODIM (SVNN-LogTODIM) method is developed to address MAGDM problems in a neutrosophic environment. Results To demonstrate the feasibility and effectiveness of the proposed SVNN-LogTODIM method, a detailed numerical example concerning engineering cost risk evaluation for farmland water conservancy construction projects supporting high-standard agricultural production is conducted. The obtained evaluation results demonstrate that the proposed approach can effectively distinguish the risk levels of different alternatives and provide a reasonable ranking of engineering projects under uncertain decision-making conditions. Discussion The proposed SVNN-LogTODIM framework integrates the uncertainty-handling capability of SVNSs with the behavioral decision-making characteristics of the LogTODIM method, thereby providing a more comprehensive approach for engineering cost risk assessment. The developed method can offer useful decision support for project managers and relevant stakeholders in identifying and prioritizing engineering cost risks under the development requirements of new quality productive forces.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Advanced Technique for Double-Valued Neutrosophic Multiple-Attribute Decision-Making and Applications to Performance Evaluation of Corporate Financial ManagementProceedings of the National Academy of Sciences, India Section A: Physical Sciences · 2026
- Spherical Fermatean Neutrosophic Framework for Proposition‐Driven Multicriteria Decision‐Making Under UncertaintyJournal of Mathematics · 2026
- Sustainable Waste Management System Selection Using Neutrosophic Exponential SetsJournal of Mathematics · 2026
- An Uncertainty‐Aware Digital Twin Framework for Dynamic Cost Prediction and Decision Optimization in Transmission Engineering ProjectsEngineering Reports · 2026
- Economic Justification for the Technological Development of the Oil and Gas Complex of the Republic of Mozambique Based on an Integrated Multi-Method Model ApproachSustainability · 2026
- Reliability Assessment of Multi-State Systems Using an Integrated Generalized Intuitionistic Fuzzy Reliability Index and Universal Generating FunctionInternational Journal of Scientific Research in Science Engineering and Technology · 2026