Leakage-resistant graph learning for risk propagation and risk-constrained control in construction supply networks
Qin Fu, Yao Wei, Yong Xiang
Key points
From the paper's conclusion- We introduce an auditable framework that separates these regimes through a strict start-of-week information contract and connects risk scores to safety-gated resource allocation.
Abstract
Introduction Construction supply network decisions require both predecision warning from information available before operations unfold and topology-aware diagnosis after the disruption context becomes visible. We introduce an auditable framework that separates these regimes through a strict start-of-week information contract and connects risk scores to safety-gated resource allocation. Methods We combined public SUCCESS construction-logistics records with a frozen queue-flow mechanism producing paired counterfactual outcomes on a heterogeneous network with 302 nodes and 1,277 edges. Models were trained on pilots A and B, selected on pilot C, and evaluated on pilot D. The strict contract excluded all week-t outcomes, service levels, and shock-source indicators. Complementary evaluations comprised context-aware diagnosis, a construction consolidation center (CCC) outage panel, leave-one-project-out evaluation, and an independent SupplyGraph boundary test. Six resource policies were compared through validation-only selection and a held-out Pareto audit. Results Under the strict contract, the graph convolutional network achieved the highest held-out area under the precision–recall curve (AUPRC) of 0.2397 and area under the receiver operating characteristic curve (AUROC) of 0.8161 for 4,252 node-weeks with 60 positives. In the context-aware regime, relational GraphSAGE achieved an AUPRC of 0.5702, exceeding the matched multilayer perceptron (MLP) by 0.0803. Across eight positive pairs involving CCC outages, GraphSAGE achieved an AUPRC of 0.5845 versus 0.4994 for the MLP, with a positive pair-specific advantage in each case. The calibrated-risk guardrail identified an aggregate service improvement of 0.827% but screened the allocation out because the affected sites and failure durations increased. The held-out frontier also identified a deficit-only allocation that improved unserved demand, affected sites, and failure durations without overriding the predeclared deployment rule. Discussion The framework combines leakage-resistant graph evaluation, context-aware relational diagnosis, project-level applicability testing, and risk-gated network control. Its explicit safety gate prevents aggregate efficiency gains from concealing propagation-risk transfer.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- XAI-enabled probabilistic pipeline for predicting delay and cost overrun risk in constructionEngineering Construction & Architectural Management · 2025
- AI-driven predictive analytics for supply chain disruption and resilience in engineering managementFrontiers in Artificial Intelligence · 2026
- Construction cost prediction using a fused loss–enhanced hybrid GCN–GAT–MLP approachEngineering Construction & Architectural Management · 2025
- AI-Driven Disruption Monitoring for Resilient Construction Supply Chains: Integrating Named Entity Recognition and Reinforcement LearningApplied Sciences · 2026
- Predictive analytics for supply chain resilience in urban infrastructure networks using graph convolutional networks.PloS one · 2026
- Modeling spatiotemporal hazard dynamics for construction safety using graph attention networksJournal of Engineering Design and Technology · 2026