Changes in operational availability following a structured preventive-maintenance program for industrial rolling doors: a before-and-after case study in lima, Peru

Roberto Carlos Calero Obregón, Karen Esteincin Cuba Vargas, Jorge Epifanio Gamarra Tolentino, Eluard Alexander Mendoza Zenozain, Nestor Bernardo Corpus Vergara

Key points

From the paper's conclusion
  • This uncontrolled before-and-after case study evaluated changes in reliability following implementation of a structured maintenance-management program centered on quarterly preventive maintenance in a manufacturing plant in Lima, Peru.

Abstract

Introduction Industrial rolling doors are operationally relevant auxiliary assets whose failures can disrupt material flow, safety, and service continuity, yet empirical maintenance evidence for these systems remains limited. This uncontrolled before-and-after case study evaluated changes in reliability following implementation of a structured maintenance-management program centered on quarterly preventive maintenance in a manufacturing plant in Lima, Peru. Methods Ten rolling doors with complete paired records were analyzed over two standardized six-month observation windows, each comprising 4,320 nominal scheduled hours per door. Failure records and technical inspections informed cause prioritization, asset-criticality assessment, failure-mode analysis, maintenance tasks, task-specific training, and standardized record keeping. Mean time between failures (MTBF), mean time to repair (MTTR), operational availability, failure count, and downtime were compared at door level. Results MTBF increased from 359.61 to 2,338.45 h (mean paired difference 1,978.84 h; 95% bootstrap CI 1,199.74–2,868.94), MTTR decreased from 48.89 to 1.55 h (difference −47.34 h; 95% CI −57.05 to −39.92), and availability increased from 85.21% to 99.91% (difference 14.70 percentage points; 95% CI 10.83–18.75). Exact paired Wilcoxon tests yielded p = 0.002 for all three outcomes. Total recorded failures decreased from 137 to 25 and downtime from 6,390 to 38 h. Discussion The changes were associated with implementation of the structured program. However, the absence of a concurrent control group, the use of nominal calendar exposure rather than recorded opening/closing cycles, incomplete intervention-fidelity records, and the short observation horizon preclude definitive causal attribution.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers