Research on start-up transition process of high-head pumped storage units
Xu Zhang, Xuan Zheng, Yazhou Hu, Haihong Zhang, Zhikang Huang, Xupeng Chen, Xueli An
Key points
From the paper's conclusion- The results show that Method 1 has the shortest start-up time (40.59 s) but causes the highest pressure pulsation (peak-to-peak pressure at the spiral casing inlet reaching 193.81 m during the simultaneous start-up of two units).
Abstract
To understand transient behavior during the start-up of high-head pumped storage units under turbine operating conditions and to identify an optimal start-up strategy, this study takes a 350 MW Francis reversible pump-turbine as a case study. It compared one-dimensional transient flow simulations to four start-up methods: large-acceleration open-loop guide vane control (Method 1), small-acceleration open-loop control (Method 2.1), acceleration-controlled closed-loop control (Method 3), and combined open-loop plus closed-loop control (Method 4). The start-up time, rotational speed evolution, and pressure pulsation characteristics at the spiral casing and draft tube were evaluated. The results show that Method 1 has the shortest start-up time (40.59 s) but causes the highest pressure pulsation (peak-to-peak pressure at the spiral casing inlet reaching 193.81 m during the simultaneous start-up of two units). Methods 3 and 4 significantly reduce pressure pulsation but result in excessively long start-ups (69.38 s and 72.70 s, respectively). Method 2.1 offers the best trade-off between start-up time (52.64 s) and pressure suppression, reducing peak-to-peak pressures at the draft tube inlet and outlet by 17.2% and 25.3%, respectively, compared with Method 1 for a single-unit start-up. Furthermore, after adjusting the guide vane motion parameters, the entropy weight method—comprehensively considering start-up duration and peak-to-peak pressures at key locations—still identifies Method 2.1 as the optimal scheme. This strategy effectively mitigates critical pressure pulsations without significantly prolonging the start-up process, providing a quantitative basis for selecting start-up schemes in high-head pumped storage plants.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Study of energy dissipation dynamics and pressure fluctuation response during pump-turbine startup in pump modePhysics of Fluids · 2025
- Full-Operating-Condition Modeling and Multi-Mode Coordinated Control Strategies for Fixed-Speed and Doubly Fed Variable-Speed Pumped-Storage UnitsProcesses · 2026
- Study on Flow Characteristics of Pump-Turbine During Start-up under Pump ModeJournal of Physics: Conference Series · 2026
- Numerical analysis of internal flow and energy loss mechanism of a pump turbine on turbine modeJournal of Physics: Conference Series · 2026
- Transient Flow Characteristics and Pressure Pulsations in a Centrifugal Pump Volute During StartupJournal of Physics: Conference Series · 2026
- Full-3D Compressible Pressure Pulsations Analysis of a Huge Francis-Type Pump-Turbine Unit Coupled with Its Water Conveyance System: Modeling Implications for Flexible Hydropower OperationMachines · 2026