From sediment pulse to ecological recovery: a nine-year study of benthic macroinvertebrate response to Elwha River dam removal
Sarah A. Morley, Jeffrey J. Duda, Holly J. Coe, Roger J. Peters, Martin C. Liermann, George R. Pess, Michael L. McHenry, Allyce R. Miller
Key points
From the paper's conclusion- These findings highlight the importance of distinguishing between numerical and ecological recovery and suggest that recovery trajectories following large dam removal extend well beyond the period of active sediment release.
Abstract
Large dam removals are increasingly important river restoration actions, but long-term ecological responses remain poorly understood, especially for removals involving large sediment releases. We evaluated benthic macroinvertebrate (BMI) responses following removal of the Elwha and Glines Canyon dams on the Elwha River, Washington, USA. At the time of removal (2011–2014), these were the largest dams to be dismantled worldwide. Dam removal reconnected over 90% of the watershed to anadromous fish, released more than 20 megatonnes of reservoir sediment downstream, and restored natural sediment and wood transport processes. Using nine years of monitoring data spanning periods before, during, and after dam removal, we quantified changes in BMI density, taxa richness, and community composition across five river sections exposed to different combinations of sediment disturbance, reservoir succession, and fish reintroduction. Sediment release substantially altered downstream physical habitat and was accompanied by pronounced declines in BMI density and richness, particularly downstream of both dams. Density declined by up to 95% during active dam removal but rebounded to near baseline levels within three years after peak sediment transport subsided. In contrast, taxa richness and community composition remained significantly altered three years after dam removal, with persistent reductions particularly evident among Trichoptera and long-lived taxa. Fine sediment was the environmental variable most strongly associated with changes in BMI community structure. Our results demonstrate that large dam removal can cause severe but largely transient reductions in BMI abundance while producing longer-lasting changes in taxonomic diversity and community composition. These findings highlight the importance of distinguishing between numerical and ecological recovery and suggest that recovery trajectories following large dam removal extend well beyond the period of active sediment release.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Spatially asymmetric and temporally dynamic ecological responses to river barrier removal: A global meta‐analysisJournal of Applied Ecology · 2026
- Rewilding the upper Klamath River Basin: rapid recolonization of Chinook salmon following the world's largest dam removal.Scientific reports · 2026
- The toxic memory of sediments: Persistent meiobenthic alteration nearly a decade after the Fundão dam failure.Marine pollution bulletin · 2026
- Persistent spatial heterogeneity in community structure of benthic macroinvertebrates in rivers around an abandoned mine.Environmental toxicology and chemistry · 2026
- Macroinvertebrate Community Stability in a Dam‐Regulated Tropical Lowland RiverAquatic Conservation: Marine and Freshwater Ecosystems · 2026
- Species Extirpation and Colonization Reveal Mixed Homogenization and Differentiation Across Terrestrial Taxa After One of the World's Largest Tailings Dam Failures.Ecology and evolution · 2026