Evaluating pre- and post-failure behavior of a large waste dump by combining LEM and DEM approach: a case study from a hydropower station, China
Jingyu Wang, Weibin Zhong, Pengxu Chen, Dinghua Si, Xuanquan Chen, Rusnardi Rahmat Putra, Baoquan Yang, Shunchao Qi
Powerchina Huadong Engineering Corporation (China) · Sichuan University
Key points
From the paper's conclusion- This study investigates a waste dump at the Yongjia Pumped Storage Power Station, China by integrating (1) a self-developed rigorous 3D Limit Equilibrium Method (LEM) for the pre-failure analysis and (2) a well-calibrated DEM for post-failure behavior.
Abstract
Large hydropower projects generate extensive waste dumps, posing significant environmental risks. Conventional 2D analyses fail to capture 3D topographic effects of typical gully terrain, while 3D discrete element method (DEM) are suitable but face calibration challenges for post-failure simulations. This study investigates a waste dump at the Yongjia Pumped Storage Power Station, China by integrating (1) a self-developed rigorous 3D Limit Equilibrium Method (LEM) for the pre-failure analysis and (2) a well-calibrated DEM for post-failure behavior. The 3D LEM reveals how meandering topography enhances stability, underscoring 3D analysis necessity. DEM simulations identify the interparticle friction coefficient (μ) as the controlling factor for debris flow trajectories and deposition patterns in winding valleys. A key highlight lies in the qualitative cross-model comparison linking the pre-failure and post-failure analyses, which supports μ = 0.2 as a representative value for the present DEM configuration and the engineering scenarios considered. This leads to a local mobilized area that remains confined within proximal slopes in DEM simulations, equivalent to a slight stability margin in LEM from the same local topographic constraints. However, failure risks persist under extreme conditions (e.g., drainage failure), where strength parameter uncertainties may arise from inadequate compaction or water lubrication (further reducing μ). Our cross-model results suggest specific reinforcement strategies to reduce the downstream risk.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Coupled CFD–DEM Modeling of Sinkhole Development Due to Exfiltration from Buried Pipe DefectsEng—Advances in Engineering · 2025
- Dynamic response and spacing optimization of a tailings dam reinforced with grid-pattern waste rock inclusions under representative ground motionsFrontiers in Earth Science · 2026
- Hydro-Mechanical Performance Framework for Performance-Based Quality Control of Excavated-Material FillsGeotechnics · 2026
- Hydro-Mechanical Coupling and Failure Mechanisms of a Reservoir Bank Slope Under Rainfall and Reservoir Water-Level Fluctuations: Physical Model EvidenceWater · 2026
- A discrete element method and computational fluid dynamics coupled investigation on the hydrodynamic erosion of soil–rock mixturesPhysics of Fluids · 2026
- A probabilistic analysis of the Brumadinho tailings dam-breach using uncertainty quantification and global sensitivity analysisarXiv · 2026