Counteracting the geotechnical hazards posed to the above ground infrastructure of an underground gas storage facility
Zbigniew Bednarczyk
Key points
From the paper's conclusion- These results were verified by slope stability analysis.
Abstract
This article presents a comprehensive geotechnical assessment and mitigation strategy for safeguarding the above ground infrastructure of an underground gas storage facility located in the depleted Strachocina gas field in Poland. The study identifies the key hazards associated with the area’s complex flysch geology, which include landslides, high groundwater levels, elevated pore pressures, and highly compressible, plastic clayey soils. These factors have a significant impact on slope stability and foundation conditions. Detailed site investigations combining drilling, ground-penetrating radar (GPR) scanning, laboratory testing, and numerical modelling (limit equilibrium method and finite element method) revealed that the initial stability conditions were insufficient, with factors of safety below acceptable limits. Consequently, major design modifications were introduced, including the relocation of critical infrastructure to more stable zones, and the implementation of pile foundations, anchored retaining walls, and comprehensive drainage systems. Long-term geotechnical monitoring conducted over 14 years (2008–2022) confirmed a significant reduction in displacement, from several millimetres to approximately 1–2 mm per year, following stabilisation. The facility, located in the depleted Strachocina gas field in south-east Poland, was affected by ground displacement, subsidence, changes in pore pressure, seepage, and potential environmental contamination. The foundations of the infrastructure presented a challenge due to the relatively steep flysch slope. The bedrock layers had a folded structure and were intersected by faults. A flat area with favourable conditions was found at the top of the hill. Landslide colluvium was found in the valleys to the north and south. The groundwater level was shallow, with pore pressure reaching 48 kPa. Laboratory tests revealed a soil moisture content of 30–50% and a high plasticity index at depths of up to 10 m, while oedometer tests revealed the soil’s high compressibility. Prior to stabilisation, inclinometer measurements detected displacements of 2–8 mm at depths of 10–16 m. These results were verified by slope stability analysis. The scope of the investigations included drilling, GPR scanning, laboratory testing, numerical modelling and monitoring. It was revealed that significant changes to the design were necessary. Compressors and buildings were relocated to the safer upper part of the hill. The water reservoir in the lower part of the site was not constructed. Pile foundations, anchors, retaining walls, and a drainage system were designed. The main achievement of the monitoring programme, which comprised 48 series of measurements from 2008 to 2022, was to confirm that the gas storage infrastructure is secure. However, small displacements of 1–2 mm are still being observed and require further monitoring.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Multi-Source Evidence Chain Identification and Mechanistic Analysis of a Creep-Type Expressway Embankment Landslide in a Mountainous Karst Area: A Case Study of the K610 Section of the Rucheng-Chenzhou Expressway.Sensors (Basel, Switzerland) · 2026
- Stress Transfer and Settlement of a Rail-Guided Derrick Foundation on Layered Fill–Residual Soil: A Field Case StudyApplied Sciences · 2026
- Integrated Hydrogeological Assessment of Underground Constructions in Swelling-Prone Keuper Lithologies: Insights from the Markusberg Tunnel (Luxembourg)Rock Mechanics and Rock Engineering · 2026
- Failure mechanism and comprehensive countermeasures of the inclined shaft in water-rich fractured strata: A case studyAin Shams Engineering Journal · 2026
- Seepage Analysis and Piping Control for the Soft-Ground Stretch of a Hydropower Headrace Tunnel Adjacent to a Valley SlopeApplied Sciences · 2026
- Converting Fractured Gas Reservoir into Underground Gas Storage: Advantages, Challenges and EconomicsFuels · 2026