Safety collaborative prevention and control technology for coal mining beneath oil pipelines.
Tuanjie Liu, Gui Liu, Xiangnan Li, Aiguo Guo, Yaokun Fu, Haoyu Hu
Shaanxi Yanchang Petroleum Jingbian Coal Industry Co., Ltd., Yulin, China. · CCTEG Coal Mining Research Institute, Beijing, China.
Key points
From the paper's conclusion- The framework provides a basis for assessing coal extraction beneath long-distance pipelines in areas with overlapping coal and petroleum resources.
Abstract
Coal mining beneath oil pipelines requires a balance between resource recovery and the control of mining-induced pipeline deformation. Using coal seam at Haichatan Coal Mine and the Jingbian-Yulin refined-oil pipeline as a case study, a coupled analysis framework was developed to link ground movement, relative pipe-soil displacement, and pipeline equivalent stress. The probability integral method was used to predict ground subsidence, tilt, horizontal strain, and curvature. The three-dimensional ground-displacement field was then applied to a nonlinear Winkler foundation model implemented in ANSYS. Sixteen scenarios were defined by combining two pipeline branches, two mining scales, and four mining-thickness levels. For full-thickness extraction of three panels, the maximum predicted ground subsidence along the western and eastern branches was 1 480 and 1 634 mm, respectively. The corresponding maximum pipeline equivalent stresses were 728 and 946 MPa, with strength-utilization ratios of 2.79 and 3.62. Reducing the effective mining thickness to 0.2M decreased these stresses to 255 and 227 MPa; however, the western branch remained close to the adopted limit, with a strength-utilization ratio of 0.977. Effective mining thickness strongly influenced the predicted response within the scenarios examined. A candidate control strategy combining a 2.3 m mining-thickness limit with trench excavation, pressure reduction, and pipeline lifting where necessary was proposed. Its safety requires further verification because the thickness limit alone does not establish compliance. A monitoring framework integrating InSAR, ground surveys, pipeline strain measurements, and trench-displacement measurements was also proposed to support model calibration and staged intervention. The framework provides a basis for assessing coal extraction beneath long-distance pipelines in areas with overlapping coal and petroleum resources.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- An Energy-Variational Model for Buried Pipelines under Mining-Induced Ground Movement Considering Pipe Yielding and Pipe-Soil Interface SlipEngineering Research Express · 2026
- Strata Movement Prediction for Safe Recovery of Vertical Shaft Protection Coal Pillars During Backfill MiningApplied Sciences · 2026
- Coupled Simulation of the Effective Radius Evolution for Gas Extraction in the Pressure-Relief Zone under Mining DisturbanceJournal of Geophysics and Engineering · 2026
- Coal seam grouting location investigation based on advanced abutment pressure distribution in large mining height working facesInternational Journal of Coal Science & Technology · 2026
- Coal Extraction Beneath Buildings: Mining Parameters and Surface Subsidence Control Using Three-Roadway Continuous Mining and BackfillingSustainability · 2026
- Dynamic Response and Slab Protection Optimization of Buried Oil Pipelines with Constrained Dent Defects Under Rockfall ImpactCoatings · 2026