Ecological dynamics and carbon sequestration in the 150 kV Tentena–Kolonedale transmission corridor
Resky Marthen Salmon, Samsu Arif, Darhamsyah Darhamsyah
Hasanuddin University
Key points
From the paper's conclusion- The construction of the 150 kV Tentena-Kolonedale high voltage overhead transmission line (SUTT) requires clearing a right of way (RoW) corridor to ensure the safety and reliability of the power transmission system, an activity that can alter land cover and reduce biomass, carbon stock, and CO 2 sequestration capacity.This study evaluated land cover change in the RoW corridor of the 150 kV Tentena
Abstract
The construction of the 150 kV Tentena-Kolonedale high voltage overhead transmission line (SUTT) requires clearing a right of way (RoW) corridor to ensure the safety and reliability of the power transmission system, an activity that can alter land cover and reduce biomass, carbon stock, and CO 2 sequestration capacity.This study evaluated land cover change in the RoW corridor of the 150 kV Tentena-Kolonedale line and its effect on biomass, carbon stock, CO 2 sequestration, and the economic value of carbon, focusing on the segment between Tower TIP 92 and TIP 99 in Poso and North Morowali Regencies, Central Sulawesi.Land cover change was analyzed using multitemporal Sentinel-2 NDVI imagery for 2019-2024, while biomass, carbon stock, CO 2 sequestration, and carbon economic value were estimated using IPCC (2019) conversion factors.Results show the corridor remained dominated by high-density vegetation throughout the observation period, ranging from 85.52 to 91.04 ha.Highdensity vegetation decreased only marginally, from 90.89 ha in 2019 to 90.88 ha in 2024 (-0.01 ha, 0.01%), so more than 99% of the corridor retained dense vegetation cover.Biomass ranged from 12,828 to 13,656 tons, carbon stock from 6,029.16 to 6,418.32 tons C, and potential CO 2 sequestration from 22,126.02 to 23,555.23 tons CO 2 e, with the estimated economic value of carbon ranging from IDR 3.32 to 3.53 billion, peaking at IDR 3,533,284,500 in 2023.Comparing 2019 and 2024 conditions reveals a loss of 1.50 tons of biomass, 0.76 tons C of carbon stock, 2.79 tons CO 2 e of sequestration potential, and about IDR 418,500 (±0.01%) in carbon economic value.These findings indicate that construction and management of the corridor caused only very limited land cover change and carbon loss.The observed vegetation changes were relatively small, indicating limited ecological disturbance during the observation period; because formal statistical significance testing was not performed, these findings are interpreted descriptively rather than inferentially, though dominant high-density vegetation continued to sustain the corridor's function as both a carbon sink and stock.The integration of Sentinel-2 NDVI analysis with biomass and carbon estimation proved effective for evaluating the ecological impact of transmission-line infrastructure, supporting sustainable vegetation management and carbon mitigation strategies.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Impact of power line corridors on carbon stocks of upland forests in eastern Canada.Plant and soil · 2026
- Loss of vegetation cover, surface warming, and depletion of carbon stocks in Surakarta City, Indonesia: A multitemporal Landsat analysis 2015–2025BIO Web of Conferences · 2026
- Spatiotemporal Carbon Valuation in the Eco-Sensitive Areas of the Western Ghats:An InVEST-PLUS Assessment (1992–2020) with 2030 ProjectionsEnvironmental Research Communications · 2026
- UAV-based mangrove biomass estimation and carbon potential valuation in North Sumatra, IndonesiaCarbon Balance and Management · 2026
- Quantifying Benthic Habitat Change in Calatagan, Batangas, Philippines Using Sentinel-2 and Linear Spectral UnmixingIOP Conference Series: Earth and Environmental Science · 2026
- Impacts of Ground Deformation on Annual Vegetation Carbon Sequestration in an Underground Mining Area Based on Scenario Simulation via a CA ModelLand · 2026