On the role of integer ambiguity resolution in the continuity of IPPP time links
Jiang Guo, Giulio Tagliaferro
Key points
From the paper's conclusion- These results demonstrate that the integer ambiguity datum of UD ambiguity resolution enables reliable recovery of IPPP time link continuity after ambiguity reinitialization.
Abstract
This study investigates how ambiguity resolution strategies affect the continuity of Global Navigation Satellite System (GNSS) Integer Precise Point Positioning (IPPP) time and frequency transfer. Although Undifferenced (UD) and Single-Differenced (SD) ambiguity resolution provide equivalent positioning accuracy, their different ambiguity datum realizations lead to fundamentally different receiver clock characteristics. UD ambiguity resolution establishes an integer ambiguity datum that is mapped into the receiver clock, making discontinuities between independently initialized arcs recoverable by integer-cycle calibration. In contrast, SD ambiguity resolution constrains only relative ambiguities, leaving the receiver clock datum referenced to pseudorange observations without such an integer constraint. We generated 35 d of GPS IPPP links among 13 stations using PRIDE-PPPAR software, with batch lengths of 1 h, 3 h, 6 h, 12 h, 1 d, 3 d, 7 d, 10 d, and 15 d. The results show that Arc Boundary Discontinuities (ABDs) in UD-based links are precisely distributed at integer values, whereas SD-based and float PPP links exhibit no clear integer characteristics. After correcting these discontinuities using integer cycles, the mean Root Mean Square (RMS) of ABD residuals is 20 ps for UD-based IPPP links. For solutions based on 1-day batch, the Standard Deviations (STDs) of the differences between UD-based, SD-based and float links with respect to optical fiber link are 170 ps, 330 ps and 770 ps, respectively. Evaluated using Allan deviations, over 80% of UD-based links demonstrate better frequency stability than SD-based links at an averaging time of 3 d. UD-based links also show consistent frequency stability across different batch lengths, whereas SD-based and float links do not. Specifically, at a 1-day averaging time, the median frequency stability of UD-based links is $$9 \times 10^{-16}$$ 9 × 10 - 16 for 3-hour batches and $$7.3 \times 10^{-16}$$ 7.3 × 10 - 16 for 15-day batches, compared to $$1.6 \times 10^{-15}$$ 1.6 × 10 - 15 and $$7.2 \times 10^{-16}$$ 7.2 × 10 - 16 for SD-based links. These results demonstrate that the integer ambiguity datum of UD ambiguity resolution enables reliable recovery of IPPP time link continuity after ambiguity reinitialization.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Day-boundary discontinuity elimination method of PPP time transfer with “0 to 0” orbit and clock productsMetrologia · 2026
- Fourier Ambiguity Validation for Carrier-Phase GNSSSensors · 2026
- Fourier Ambiguity Resolution for Carrier-Phase GNSSApplied Sciences · 2026
- Analysis of Triple-Frequency PPP Ambiguity Resolution with Different Ambiguity Fixing Methods.Sensors (Basel, Switzerland) · 2026
- Reference-satellite dependence in wide-area PPP-RTK ionospheric modeling: a controlled comparison of undifferenced and between-satellite single-differenced STECFrontiers in Astronomy and Space Sciences · 2026
- Improving the stability of real-time PPP solutions by receiver clock modelingGPS Solutions · 2026