Abstract

Saudi Arabia is deploying renewable generation at utility scale, and the 300 MW Sakaka photovoltaic (PV) project is the first such plant in the Kingdom. However, public information on the project is largely limited to the officially reported investment, tariff, and expected generation, and these figures have not been examined against independent simulation. To address this, the project is assessed along four explicitly scoped dimensions: project economics, environmental context, social perceptions, and technical considerations. The economic assessment employs a system advisor model (SAM) benchmark configuration of 335.004 MWdc/301.440 MWac (a fixed horizontal array, DC/AC ratio 1.11), which yields a generation of 581 GWh in the first year, a real levelized cost of electricity of 4.11 cents/kWh, and a net capital cost of US$692 million. These values are reconciled with the officially reported investment of ~US$302 million, the contracted tariff of 2.3417 cents/kWh, and the expected annual generation of more than 930 GWh. A cash flow screening based on the official figures and stated simplifying assumptions gives a simple payback of 17.5–20.7 years and a net present value (NPV) between negative US$58 million and negative US$96 million at a 5% real discount rate and between approximately break‐even (US$1 million) and negative US$48 million at 3%, depending on the operation and maintenance assumption. The plant is reported to avoid ~430,000 tCO annually. The social component is a secondary analysis of a 2019 online survey of 602 respondents drawn from a convenience sample: 92.0% supported deploying renewables to create jobs, 75.2% expected renewables eventually to be deployed more than fossil fuels, and 44.5% agreed to an unspecified increase in their electricity bill; 51.4% of those who expected a future dominated by renewables did not agree to the bill increase. These results describe the sampled respondents only and are not representative of Saudi or Al‐Jouf opinion. The technical component simulates the energy yield in the first year of operation for the same 335.004 MWdc/301.440 MWac configuration using the Python interface to SAM (PySAM 7.1.0) and the Sakaka typical meteorological year. Simulated net AC generation is 595.9, 662.0, and 754.9 GWh for horizontal, latitude tilt, and single axis tracking arrays, corresponding to AC capacity factors of 22.6%, 25.1%, and 28.6%, and a Monte Carlo analysis of 3072 runs gives conditional P50/P90 generation of 646.5/618.4 GWh for the fixed tilt array and 737.1/705.4 GWh for the tracking array. Grid integration is discussed on the basis of the published literature. Within these limits, the results characterize Sakaka as an early reference case for utility scale solar deployment in Saudi Arabia.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Saudi Arabia’s Sakaka Solar Project: Economic and Environmental Assessment, Social Perceptions, and Technical Considerations — Science Skim