Effect of Bearing Plate Position and Cantilever Diameter on the Effective Calculated Length of Pile Side Friction in Compressive NT‐CEP Piles With a Bearing Platform
Yongmei Qian, Zhuhan Zhao, Hanyuan Chang, Yingtao Zhang, Ming Guan
Key points
From the paper's conclusion- Therefore, in actual engineering practice, the plate cantilever diameter should be kept as close as possible to 1.5–2 times the pile diameter. β 2 is the influence coefficient between the plate cantilever diameter and the effective calculated length, with values ranging from 0.24 to 1.2 within this range.
Abstract
Pile‐side friction resistance is an important component of the compressive bearing capacity in new type concrete‐expanded plate (NT‐CEP) piles. Bearing plate position and plate cantilever diameter constitute important factors affecting pile‐side friction resistance. This study employs ANSYS finite element analysis to investigate the specific impacts of bearing plate position and plate cantilever diameter on the effective calculation length of side friction under vertical loading. By systematically analyzing displacement contour and soil stress distribution plots at the ultimate failure state, the results indicate that, as for the plate position, when the distance between the plate and the platform is less than 12 times the pile diameter, the effective calculation length of the lateral friction resistance increases as the plate moves farther away from the platform. However, when this distance is exceeded, the effective calculation length tends to stabilize as the plate moves further away from the platform. In engineering practice, it is recommended that the design value for the pile length above the plate be controlled between 10 and 12 times the pile diameter, with preference given to the smaller value. β 1 is the influence coefficient between the pile position and the effective calculation length; within this range, its value lies between 0.01 and 0.176. Regarding the plate cantilever diameter, when the cantilever diameter is less than twice the pile diameter, the effective design length decreases as the cantilever diameter increases. Beyond this range, the effective calculated length tends to stabilize. Therefore, in actual engineering practice, the plate cantilever diameter should be kept as close as possible to 1.5–2 times the pile diameter. β 2 is the influence coefficient between the plate cantilever diameter and the effective calculated length, with values ranging from 0.24 to 1.2 within this range. These findings offer a comprehensive theoretical basis for their future promotion and implementation of NT‐CEP pile systems.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Comparative study on bearing properties of bored piles with two different length-to-diameter ratios by field tests in sand/silty clay formationInternational Journal of Geotechnical Engineering · 2026
- Experimental Study on Lateral Bearing Characteristics of Prestressed High-Strength Concrete Pipe Pile Group FoundationsApplied Sciences · 2026
- Effect of karst cave roof thickness and span on the bearing behavior of pile foundations underlying karst cavesJournal of Physics: Conference Series · 2026
- Horizontal Bearing Behavior and Reinforcement Efficiency of Cemented Soil Mixed Reinforced (CSMR) Pile: Model Tests and Numerical SimulationsBuildings · 2026
- Nonlinear Analysis for Extended Pile Shaft Under Combined Vertical and Lateral LoadsInternational Journal for Numerical and Analytical Methods in Geomechanics · 2026
- Study on the Applicability of Vertical Bearing Capacity Calculation Methods for Large-Diameter Pipe Piles Based on a Static Load Test DatabaseEng · 2026