Using Managed Aquifer Recharge to Defer High‐Capital‐Cost Investments and Avoid Lock‐In in Semi‐Arid Australia
John Kandulu
Key points
From the paper's conclusion- This study re‐examines the 2016 decision to construct the A$491 million Murray River pipeline for Broken Hill, New South Wales and asks whether a managed aquifer recharge (MAR) first strategy could meet the city's long‐term water‐supply objective at lower expected cost while avoiding premature commitment to irreversible capital investment.
Abstract
Water‐scarce regions must plan long‐lived infrastructure under uncertain inflows, drought risk and future demand. Single‐decision‐point benefit–cost analyses (BCAs) can understate the value of flexibility when large, irreversible water‐supply investments are assessed without explicitly representing future decision opportunities. This study re‐examines the 2016 decision to construct the A$491 million Murray River pipeline for Broken Hill, New South Wales and asks whether a managed aquifer recharge (MAR) first strategy could meet the city's long‐term water‐supply objective at lower expected cost while avoiding premature commitment to irreversible capital investment. We develop a stochastic real‐options benefit–cost framework over a 30‐year planning horizon. Across 10,000 Monte Carlo simulations, the historical single‐decision‐point pipeline policy is compared with an adaptive MAR‐first policy in which the pipeline is retained as a contingent option and exercised only if available supply falls below 2.5 GL for two consecutive years. The three possible adaptive outcomes are evaluated jointly as one decision strategy, weighted by their simulated frequencies. The model incorporates probabilistic supply and demand variation, capital and operating costs, salinity and greenhouse‐gas externalities, and lower‐tail reliability using Conditional Value at Risk (CVaR). The adaptive MAR‐first policy has an expected present value of costs (EPVC) of A$372.1 million, compared with A$621.4 million for the benchmark pipeline policy, an expected saving of A$249.3 million (40.1%). The pipeline is exercised in approximately 5% of adaptive‐policy futures and remains unexercised in approximately 95%. Mean annual available supply is 9.58 GL/year under the adaptive policy compared with 7.70 GL/year under the benchmark. In the lowest‐yield 5% of simulated outcomes, average annual available supply is 2.52 GL/year under the benchmark policy and approximately 5.20 GL/year under the adaptive policy. Both values remain below the representative 7.5 GL/year demand benchmark, meaning that extreme drought conditions can still produce supply shortfalls; however, the smaller gap under the adaptive policy indicates substantially reduced lower‐tail shortfall exposure. The results show that MAR‐led sequencing can improve the cost‐reliability trade‐off while reducing expected lifecycle cost and premature capital commitment under deep uncertainty.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Managed Aquifer Recharge Operations and Design under Hydrologic Uncertainty.Ground water · 2026
- A multicriteria decision making framework integrating WEAP and MCDM for optimal water transfer from the Doogh River to the Gorganrud River in IranDiscover Water · 2026
- Integration of clustering and principal component analyses in MCDA to identify feasible regions for managed aquifer rechargeJournal of Hydrology · 2026
- On the Choice of Optimal Reservoir Operating Rules in a Changing Climate for the Sustainable Management of Drinking Water SourcesWater Resources Management · 2026
- Optimal Trade-Off of Dynamic Water Resources Spatio-Temporal Allocation Considering Seasonal Variations: A Multi-Stage Multi-Objective Programming with Hybrid Uncertainty and Risk PreferenceWater · 2026
- Multi-Agent-Based Water Resources Allocation Under Water Network Connectivity: A Case Study of the Poyang Lake Basin, ChinaApplied Sciences · 2026