From the paper's conclusion- We developed a bi-objective mixed-integer linear program that jointly sizes the vessel fleet, charging infrastructure, pier photovoltaics, battery storage and discrete service speed for seven scheduled routes across four Thai island clusters, minimising discounted cost and maximising emission reduction against a scope-matched diesel baseline.
Abstract
Battery-electric passenger boat studies usually treat range, charging and capital cost as binding constraints, assume near-zero-carbon grids, and ignore the speed passengers already receive. We developed a bi-objective mixed-integer linear program that jointly sizes the vessel fleet, charging infrastructure, pier photovoltaics, battery storage and discrete service speed for seven scheduled routes across four Thai island clusters, minimising discounted cost and maximising emission reduction against a scope-matched diesel baseline. Electrified journey time may not exceed the fastest incumbent's beyond a scanned tolerance. Inputs combine published pier coordinates, operator timetables, the national vessel registry, Marine Department passenger statistics and Coriolis fuel-meter measurements on twelve vessels; carbon credit potential is computed ex ante but not optimised. Journey time, not battery range, determines feasibility: it excludes every displacement hull, and two of seven services cannot be served by any commercially available vessel. Eligible electric vessels carry 10–30 passengers against incumbents of 8–350, so optimal fleets reach 24–968 vessels and USD 35.2–693.9 million of investment. Sixteen of twenty configurations cut emissions by up to 41.0% of the baseline; the other four increase them by up to 5.5% under a grid emission factor of 0.4857 kg CO2 kWh−1. No configuration is economically viable: break-even carbon prices of USD 8,296–16,070 per tCO2e lie close to three orders of magnitude above traded prices. Only pier photovoltaics with storage is marginally viable (net present value USD 0.22 million), supplying 45%–50% of charging energy. Electrifying non-speed-competitive services is justified now; speed-competitive services await larger high-speed electric vessels.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Sizing, economic analysis and optimisation of green hydrogen refuelling stations in a cluster of small islandsRenewable Energy · 2026
- Energy-aware scheduling and berth allocation for ferries under phased cold ironing upgradesTransportation Research Part E Logistics and Transportation Review · 2026
- Optimization and sustainability assessment of hybrid PV-powered EV charging and hydrogen refueling systems for low-carbon transportScientific Reports · 2026
- Joint Optimization of Berth and Shore Power Allocation Considering Vessel Priority Under the Dual Carbon GoalsJournal of Marine Science and Engineering · 2026
- Low-Carbon Economy Optimization of Park-Level Integrated Energy Systems Considering Temporal and Spatial Scheduling of Large-Scale Electric VehiclesProcesses · 2026
- An Electric Boat Dial-a-Ride Problem with Tide- and Load-Dependent Accessibility and Energy ReplenishmentJournal of Marine Science and Engineering · 2026