IOP Conference Series: Earth and Environmental Science

Proposed Solutions for Minimizing Basement Floor Cracking in the Semi Top-Down Method in Vietnam

Pham Quang Vuong

Key points

From the paper's conclusion
  • Based on these considerations, this study proposes a set of technical solutions to minimize basement floor cracking in semi top-down construction.

Abstract

In the context of the rapid development of high-rise buildings in Vietnam, the semi top-down method for basement construction has been increasingly adopted due to its advantages in construction scheduling and its effectiveness in controlling deformation of adjacent structures. However, in practice, basement floor slabs frequently crack during construction, adversely affecting architectural performance, structural load-bearing capacity, and the overall service life of the building. Previous studies indicate that cracking arises from multiple factors, including deficiencies in geotechnical investigations, inaccurate estimation of construction loads, inappropriate arrangement of floor openings, insufficient detailing of structural connections, as well as limitations in construction practices and quality management. Based on these considerations, this study proposes a set of technical solutions to minimize basement floor cracking in semi top-down construction. The proposed solutions adopt a holistic approach, encompassing the enhancement of geotechnical investigation reliability, accurate determination of actual construction loads, optimization of structural design at critical locations such as slab openings and kingpost connections, application of fiber-reinforced concrete to improve crack resistance, and strengthening of construction quality control procedures. By reducing the occurrence of cracking and the associated need for repair and maintenance, these solutions also contribute to the sustainable development of construction projects through improved material efficiency, reduced construction waste, lower lifecycle maintenance requirements, and enhanced durability of underground structures. Consequently, the proposed framework not only provides practical engineering guidance for mitigating crack risks in basement slabs during semi top-down construction but also supports the broader objective of delivering more sustainable, durable, and resource-efficient buildings. The proposed framework may serve as a practical reference for basement construction projects under similar conditions in Vietnam.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers