IOP Conference Series: Earth and Environmental Science

Application of the MIKE Hydrodynamic Model to Assess Flooding in the Downstream Area of the Ly Ly River to Support the Planning of the Moc Bai Rest Stop

Phuong T.K. Doan, Tuyen X. Kieu

Key points

From the paper's conclusion
  • This study applies the MIKE modeling system, including the rainfall- runoff model MIKE NAM, the one-dimensional model MIKE 11, and the two-dimensional model MIKE 21 coupled through MIKE Flood, to assess flooding in the downstream Ly Ly River basin, Quang Nam province, Vietnam.

Abstract

This study applies the MIKE modeling system, including the rainfall- runoff model MIKE NAM, the one-dimensional model MIKE 11, and the two-dimensional model MIKE 21 coupled through MIKE Flood, to assess flooding in the downstream Ly Ly River basin, Quang Nam province, Vietnam. The study supports the planning of the Moc Bai Rest Stop along National Highway 1A while ensuring that the proposed infrastructure does not increase regional flood risk under present and future development conditions. The research also contributes to climate-adaptive infrastructure planning and disaster-risk reduction in flood-prone areas of Central Vietnam. The integrated 1D-2D modeling framework was developed using topographic, hydrological, and rainfall data, and calibrated and validated based on the major flood events of 2017 and 2021. Four scenarios were simulated: (i) baseline conditions without the project; (ii) construction of the rest stop under current conditions; (iii) construction under the 2033 infrastructure planning scenario, including the North-South high-speed railway; and (iv) the project combined with flood mitigation measures through a flood protection dike. Simulation results indicate that severe inundation mainly occurs during major flood events when overflow from the Ly Ly River propagates toward the Ba Ren and Truong Giang Rivers in the estuarine zone. Under current conditions, flooding is concentrated near the river mouth, while the proposed rest stop area, located on relatively elevated terrain behind National Highway 1A, experiences limited inundation. The construction of the rest stop causes negligible changes in flood levels and inundation extent compared with the baseline scenario. Under the 2033 planning scenario, additional infrastructure components slightly influence regional flooding when appropriate drainage systems are incorporated. The integrated MIKE modeling framework proved effective for evaluating flood behavior and supporting infrastructure planning in the downstream Ly Ly floodplain. The approach can also support flood-risk management and future climate-adaptation planning in similar low-lying basins of Central Vietnam.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers