Key points

From the paper's conclusion
  • The results show that the pressure vessel satisfies all API 579 acceptance criteria and remains fit for continued operation, with an estimated remaining service life of 13.5 years.

Abstract

This study presents the application of the Fitness-for-Service (FFS) method as a sustainable maintenance strategy for pressure vessels operating in the energy industry. Aging pressure vessels are critical assets in oil and gas processing systems, where replacement is often associated with high economic costs and increased environmental impact. Therefore, extending asset service life through reliable integrity assessment becomes an essential approach to support sustainable development. The research focuses on a production separator vessel subjected to metal loss damage due to corrosion. Ultrasonic Testing (UT) data were utilized and evaluated using the API 579 FFS standard, focusing on key parameters including minimum thickness, average thickness, and Maximum Allowable Working Pressure (MAWP). The assessment was conducted using Level 1 and Critical Thickness Profile (CTP) approaches to determine the structural integrity and fitness of the vessel for continued operation. The results show that the pressure vessel satisfies all API 579 acceptance criteria and remains fit for continued operation, with an estimated remaining service life of 13.5 years. This provides a quantitative engineering basis for deferred equipment replacement and supports maintenance planning for aging pressure vessels. From a sustainability implication, the study demonstrates the economic implications of asset life extension, while the associated environmental benefits are discussed qualitatively because a full Life Cycle Assessment was beyond the scope of this work.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers