Environmental Research Letters

Modeling freshwater use for direct lithium extraction from geothermal brines in the Salton Sea

Lakshani Gunawardhana, Margaret M Busse

Key points

From the paper's conclusion
  • Direct lithium extraction (DLE) from geothermal brines
is of particular interest because co-location with closed-loop geothermal operations avoids
the large land footprint of evaporitic ponds and the carbon intensity of hard-rock mining.
The Salton Sea Known Geothermal Resource Area (SS-KGRA) hosts geothermal operations
with co-located pilot-scale DLE facilities, making it among th

Abstract

Global lithium demand is projected to more than double by 2035, to about 715 kt per year (3.8 Mt LCE per year) under the IEA Stated Policies Scenario, intensifying the need for new, sustainable extraction routes. Direct lithium extraction (DLE) from geothermal brines is of particular interest because co-location with closed-loop geothermal operations avoids the large land footprint of evaporitic ponds and the carbon intensity of hard-rock mining. The Salton Sea Known Geothermal Resource Area (SS-KGRA) hosts geothermal operations with co-located pilot-scale DLE facilities, making it among the advanced regions for geothermal lithium extraction. Though these operations are expected to reduce land and carbon intensity, they require freshwater inputs across multiple unit operations; this demand has been reported only as facility-wide aggregates, without process-level resolution, despite potential US operations existing in an arid region constrained by agricultural water use. Existing estimates do not track the internal fate of process water, which determines the net volume drawn from external sources. Herein, we present LiHydroSim, a process-based model that translates publicly available process descriptions into a facility-level freshwater balance through a three-layer architecture separating gross unit-operation demand, internal recovery, and net external supply. Applied to a representative adsorption-based facility processing 7000 gallons per minute of geothermal brine, the model estimates net external freshwater demand of 1719 acre-feet per year (152 m3 t −1 lithium carbonate equivalent (LCE); 0.12 AF/t LCE), below the 189–355 m3 t −1 LCE (0.15–0.29 AF/t LCE) reported by Salton Sea developers, consistent with auxiliary demands outside the process boundary. The eluant for lithium elution dominates the water balance, accounting for 92% of gross internal process-water demand, while internal recycling offsets roughly one third of that gross demand. Total demand depends mainly on eluant volume: across two patent-specified operating modes, it ranges from 870 to 1719 acre-feet per year.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Modeling freshwater use for direct lithium extraction from geothermal brines in the Salton Sea — Science Skim